Laserfiche WebLink
GROUNDWATER MONITORING WELL PURGEISAMPLING WORK SHEET <br /> i <br /> Project Name: � riruc.c LG►,L��.� i <br /> Project Number: <br /> Address: Well Lock Number: <br /> ' Well Number. I —r"A w f <br /> DevelopmentlPurge/Sampler(s): <br /> I <br /> Screened at WELL VOLUME CALCULATION <br /> ' Well Casing Total Well Depth to Linear Feet Galton Per <br /> Diameter (in.) De th ft. Goundwater G of GW Linear Foot 4 Well Volu_m�aL} <br /> 2 - X 0.17 <br /> 3 _ <br /> ' 4 X 0-38 j •6� <br /> X 0.66 <br /> 4.5 - X 10.83 - <br /> 6 = X 1.5 = <br /> tGROUNDWATER SURFACE INSPECTION (BAILER CHECK) <br /> Floating Product (ft.) (in.): Sheen/Iridescence: 1t 1Yrz Odor: _ 1f jp�� <br /> ' GROUNDWATER PURGING PURGE METHOD <br /> r� <br /> ❑ Stainless Steel Bailer, ® Submersible Pump; ❑ Air Diaphragm Pump; ❑ Other <br /> ' Stagnant Volume <br /> Volumes Purged Conductivity Temp. Color/Turbidity Recovery <br /> Purged (gal.) Time pH pslumhos of °C (other) Depth Time <br /> ' 0 0 x.30 <br /> 3 <br /> 4 <br /> 6 <br /> ' 810 � <br /> 9 <br /> GROUNDWATER SAMPLING <br /> vel Rec <br /> ' Water Leovery Samp€e Containers <br /> Depth to GW(ft.) No. Preservation Method/pH <br /> (1) Initially T'•A-zl 1 liter (f), amber glass <br /> (P) After Purging 1T= F 1 40 mf, VOA - <br /> ' P - 0.8 (P-I) = 80% Recovery 500 mf, polypropylene <br /> (S) Before Sampling Z Trip Blank <br /> (P-S) I (P-1) X 100 = /QQ% Total Recovery <br /> // i <br /> Sample Date/Time: S-Ac . 7 : 5-o Turbidity (NTU): () <br /> DO (mg/L): <br /> ' PURGED WATER CONTAINMENT <br /> ,Octal drums at site: Water Soil Water pump through treatment system <br /> ' Remarks. <br /> ' - .,. - - .... .... ..._. .-� OST <br /> CswM-w?Sw.F11Y[ <br /> 3/7196 pb <br /> s <br />