My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004669
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
151
>
3500 - Local Oversight Program
>
PR0545482
>
ARCHIVED REPORTS_XR0004669
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 1:12:30 PM
Creation date
3/10/2020 9:08:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004669
RECORD_ID
PR0545482
PE
3528
FACILITY_ID
FA0005075
FACILITY_NAME
DONS MOBILE GLASS
STREET_NUMBER
151
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
953365719
APN
21941015
CURRENT_STATUS
02
SITE_LOCATION
151 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> ATC Associates,Inc Project No 99975 7501 <br /> ' GROUNDWATER MONITORING <br /> AND REMEDIATION STATUS REPORT - NO. 4 <br /> Fourth Quarter 1998 <br /> 151 South Main Street <br /> Manteca, California <br /> rFebruary 15, 1999 <br /> ' 1.0 INTRODUCTION <br /> ' This report has been prepared on behalf of Value Reclamation Corporation by ATC Associates, <br /> Inc (ATC) ATC, having acquired the assets of On-Site Technologies, Inc (OST) in July <br /> 1998, has assumed all of OST's responsibilities regarding monitoring and remediation of this <br /> site <br /> The purpose of this report is to fulfill quarterly monitoring requirements by the San Joaquin <br /> County Public Health Services(SJCPHS),to maintain a groundwater monitoring history for the <br /> site and to present data addressing the status and effectiveness of the soil and groundwater <br /> remediation program implemented at the site Included in this report are the results of two <br /> monitoring periods performed in April and August 1998 Section 2 0 presents the groundwater <br /> sampling procedures Section 3 0 presents the analytical results and water level measurements <br /> for this monitoring period, and Section 4 0 addresses the remediation program <br /> 2.0 GROUNDWATER SAMPLING PROCEDURES <br /> ' The locations of the groundwater monitoring wells and other relevant features are shown on <br /> Figure 2 Table 1 summarizes the construction details for all monitoring and co-extraction wells <br /> related to the site investigation <br /> Following groundwater level measurements,groundwater samples were collected on December <br /> r10, 1998 Additionally, a follow-up sample from monitoring well BEI-MW3 was collected on <br /> January 28, 1999, because their was some doubt as to the validity of the original sample The <br /> ' following protocol was used in obtaining groundwater samples <br /> • Before purging, water levels were measured with an electronic interface tape capable of <br /> ' measuring the static water level and hydrocarbon product/water interface in one immersion <br /> Before sampling, the wells were purged to replace stagnant water in the well with fresh <br /> aquifer water The wells were purged using either an air diaphragm or submersible pump <br /> Groundwater Monitoring and Remediation Status Report Page 4 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.