Laserfiche WebLink
GROUNDWATER MONITORING WELL PURGE/SAMPLING WORK SHEET <br /> Project Name S� A,&t.vi e C(ti_ Project Number <br /> Address Well Lock Number <br /> iWell Number (� —M��-- <br /> Development/Purge/Sampler(s) <br /> ' Screened at WELL VOLUME CALCULATION <br /> Well Casing Total Well Depth to Linear Feet Gallons Per <br /> Diameter fm 1 Depth (ft.1 Goundwater G of GW Linear Foot 1 Well Volume (gal) <br /> 2 x 017 <br /> — <br /> i 3 ! _ X 0 38 _ J 7l/ <br /> 4 X 0613 <br /> a 5 — = X 0 83 = <br /> 6 — = X 15 - <br /> ' GROUNDW TER SURFACE INSPECTION (BAILER FloatingProduct ft in ,� { j ER CHECK) <br /> ( ) ( ) Sheen/Iridescence /—/C� Odor <br /> GROUNDWATER PURGING PURGE METHOD <br /> ❑ Stainless Steel Bailer, 3 Submersible Pump, ❑ Air Diaphragm Pump ❑ Other <br /> iStagnant Volume <br /> Volumes Purged Conductivity Temp Color/Turbidity Recovery <br /> ' Purged (gal ) Time pH pslumhos of OC (other) Depth Time <br /> 17 _S 70 20 , r <br /> 3 ' Z Q c rt <br /> tt.' , b 7th <br /> 5 <br /> ' s <br /> 8 <br /> 10 <br /> ' GROUNDWATER SAMPLING <br /> Water Level Recovery Sample Containers <br /> Depth to GW(r ) No Preservation Method/pH <br /> (1) Initially j 1 liter (P), amber glass <br /> ' (P) After Purging} 40 me VOA --T <br /> P - 0 8 (P-1) = 80% Recovery 500 me, polypropylene <br /> (S) Before Sampling Trip Blank <br /> ' (P-S) / (P-I) x 100 U] 9°0 Total Recovery <br /> Sample Date/Time �). s �1 YO Turbidity (NTU) _ <br /> DO (mglL) - <br /> ' <br /> PURGED WATER CONTAINMENT EH (MEV) <br /> ' Total drums at site Water Soil Water pump through treatment system <br /> Remarks <br /> ' - OST <br />