Laserfiche WebLink
- GROUNDWATER MONITORING WELL PURGEISAMPLING WORK SHEET <br /> Protect Name _ /4�a.K,�� _ Project Number 76 1- I+'L <br /> Address Well Lock Number <br /> ' Well Number L�/►/�t,/I <br /> DevelopmenUPurge/Sampler(s) <br /> t creened at WELL VOLUME CALCULATION <br /> Well Casing Total Well Depth to Linear Peet Gallons Per <br /> Diameter (in) Depth ft Goundwater G of GW Linear Foot I Well Volume (Sal) <br /> X 033 -_ <br /> - /` - <br /> tGROUNDWATER SURFACE INSPECTION (BAILER CHECK) <br /> Floating Product (t` ) (in ) SheenllridescenceUt4eZ _ Odor <br /> ' GROUNDWATER PURGING PURGE METHOD <br /> ❑ Stainless Steel Bailer R�'Subme-rsible Pump, ❑ Air Diaphragm Pump ❑ Otner <br /> Stagnant Volume Recovery <br /> Volumes Purged Conductivity Temp Color/Turbidity <br /> Purged (gal ] Time pH ps/umhos ofac (other) Depth Time <br /> ' o Cr �3 .% ---.- - 77(023 <br /> 1 (-1_ U I I .38 -7-7 —I1 b <br /> 3 f��-U— [1 ' �f --s -7k ZZ ey <br /> 4 <br /> ' 5 <br /> 6 <br /> 8 <br /> 9 <br /> ' 10 <br /> GROUNDWATER SAMPLING <br /> ' Water Level Recovery Sample Containers <br /> Depth to GW (ft ) No Preservation Method/pH <br /> (1) Initially _ �� — 1 liter (P), amber glass <br /> (P) After Purging L2L--C10 40 me, VOA <br /> ' P - 0 8 (P-I) = 80% Recovery 500 me, polypropylene <br /> (S) Before Sampling r'.Z-'( Trip Blank <br /> (P-S) / (P-1) X '100 COO % Total Recovery <br /> ' Sample Date/Time �G� Turbidity (NTU) (e �o <br /> DO (mg/L) Is <br /> PURGED WATER CONTAINMENT EH (MEV) - 4- <br /> Total drums at site water Soil Water pump through treatment system <br /> ' Remarks <br /> OST _ <br /> f , 1i i tilt i i t5 <br />