Laserfiche WebLink
' GROUNDWATER MONITORING WELL PURGEISAMPLING WORK SHEET <br /> Address. Project Name �tl�►�-Lcw _�lw.�, Project Number 77a <br /> Wel! Lock Number <br />' Well NumberJ— AXw <br /> Development/Purge/Sampler(s) _ <br /> tScreened at WELL VOLUME CALCULATION <br /> Well Casing Total Well Depth to Linear Feet Gallons Per <br /> Diameter fln) Dep.Ah (fLI, _Gound nater (GVV) of GW Linear Foot 1 Well Volume (gal <br /> 2 �y X 017 — - <br /> 4 — = X 066 <br /> 45 — = X 083 = <br />' 6 — X 15 <br /> GROUNDWATER SURFACE INSPECTION (BAILER CHECK) <br />' Floating Product (ft) (in ) Sheen/iridescence 0r?'1- Odor -e-3 <br /> GROUNDWATER PURGING PURGE METHOD <br /> ❑ Stainless Steel Bailer; ,Submersible Pump, ❑ Air Diaphragm Pump, ❑ Other <br />' Stagnant Volume <br /> Volumes Purged Conductivity Temp Color/Turbidity Recovery <br /> tPurged (gal ) Time pH ,uslumhos of OC (other) Depth Time <br /> 010 o l© a � ! ` <br /> 2 -t�a <br /> 4 � 3 <br /> 1 8 <br /> 9 <br /> ' 10 <br /> GROUNDWATER SAMPLING <br /> t Water Level Recovery Sam Ie Containers <br /> Depth to GW (ft) No Preservation Method/pH <br /> (1) Initially 15--617 p 1 liter (P), amber glass <br /> (P) After Purging cc (1 40 me VOA <br /> ' P - 0 8 (P-1) = 0% Recove 500 me, polypropylene <br /> �' , P YP PYlene <br /> (S) Before Sampling � Trip Blank <br /> (P-S) 1 (P-1) X 104 = f /%C Total Recovery <br /> 1 Sample Date/TimeTurbidity NTU r <br /> DO (mg/L) <br /> • PURGED WATER CONTAINMENT <br /> ' Total drums at site Water Soi! � Water pump through treatment system <br /> Remarks <br /> ' OST <br /> GWMi wpSw F(km <br /> lnrnt �4 <br />