My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012576
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
260
>
3500 - Local Oversight Program
>
PR0545483
>
ARCHIVED REPORTS_XR0012576
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 9:04:49 PM
Creation date
3/10/2020 10:57:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012576
RECORD_ID
PR0545483
PE
3528
FACILITY_ID
FA0005939
FACILITY_NAME
MANTECA MULTIMODAL STATION
STREET_NUMBER
260
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22102024
CURRENT_STATUS
02
SITE_LOCATION
260 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� �� " .�`•�� '�� ..V-a °��'. ���.::.�•%• r '� �tifi c�p� hhff. .-�i�;r� a krr r. sly' a, a-a. ..,. <br />.ks <br /> f� m <br /> 1 <br /> w used; the <br /> auger drilling equipment will be <br /> c workplan• The <br /> VIII. RESNA Co. attached to thisrepared flights to <br /> plate application i� rOperlY P will also <br /> drilling Permit aPP sufficient p• Equipment <br /> rig will be equipped with cleaning• for <br /> well without steam Spool sampler <br /> complete the Modified spsoil samples. A core <br /> 16" California a{ the <br /> include an tubes for obtaining nature <br /> holding 2' metal due to the unconsolidated <br /> catcher may be needed <br /> soils to be penetrated. the Fid on location; the <br /> described by is the depth <br /> i0" which and is <br /> 2. Soils penetrated will be the tank pulls, <br /> soil sample will be collect{damt table in <br /> {first samples were to^en measured water •?0, , and <br /> that previous thedepthof the highest at 15' , <br /> approximately samples will also be taken measured at <br /> Soil possible; (recently <br /> recent years. water table as P <br /> as close to the sealed <br /> 22• bgl•) the RG, promptly Certified <br /> described by to a State <br /> All samples will be ending transport will be <br /> 3. and placed on ice P the work, the samples with <br /> labeled. Gpon campletion of lar chain of cuStodY, <br /> laboratarY- laboratory under Prop <br /> test f,�r STEX and TPH-D. <br /> delivered to the laced in <br /> instructions to angering operations will be placed <br /> and stored an site pending <br /> 4. Spoils removed during during the drilling <br /> Properly marked & sealed drums roduced orate drums- <br /> analyse5. Any fluids produce <br /> in Sep <br /> o{ laboratory also be <br /> o <br /> completion operations will �,l CID screw-tyPe+ <br /> j comp operation, ravel <br /> 5, A{ter completion of the bariPVC will be installed and plate <br /> blank °� slatted an the schematic wester <br /> completed as shown ?' above the ravel <br /> interior flush, will be about will be g <br /> packed, cemented, perforations The hale <br /> LX, The top df the telyP ip feet below• seal , and cemented to <br /> table, with aPpra:cimaappeed with a bentonite anding locking <br /> c' an exp laced <br /> packed as required, be sealed_with ") will be P <br /> The pipe will <br /> 5 ("Christy box with the Surface- <br /> the <br /> urface•the surface. lace, {lush labeled <br /> cap and a suitable surf ace and the well prop <br /> casing and cemented in P PVC will be <br /> around the will be installed,north side of the <br /> A traffic cover The oar <br /> Dint. <br /> far future iu5etasiaasurVey reference P . ,,abbiny <br /> notched for developed a 15 <br /> �4 hours, the well equiprcent for 'i least be <br /> Llithin 18 to suitable o erations will <br /> hard rubber disk or the swabbing pstored on site <br /> ,lth removed during drums and <br /> m_.nutesi pater labeled & sealed <br /> placed in properly <br /> laboratory results. at least <br /> pending and tested after bailing <br /> 7: Groundwater will be sampled <br /> _. 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.