Laserfiche WebLink
` 4 2 <br />.f <br /> d <br /> fi <br /> NO <br /> 6 � <br /> San Joaquin Local Health District Re: Soil Reexcavation & Resamp'e Mork Plan <br /> dune 27,_1989 _ Page_'L of 2 r _ 260 S. Main Street, Manteca, CA <br /> 5. Reexcavation and resample s`.aps: We are proposing to reexcavate the west end <br /> of the original excavation w`;th a backhoe to a depth of 15' . The hole will be <br /> 8' wide x 8' long = 64 sq. f•:. Thn original sample was taken at a depth of 10'. <br /> We will collect four (4) side ;-all samples at this depth and one (1) bottom <br /> sample at 15'. All excavated soil will be placed on 6 mil plastic and covered <br /> with same. The amount of excavated soil is estimated to be 35.5 cubic yards, <br /> which will require l sample. This sample will be taken at the same time as the <br /> other samples. The hole will be barricaded. The samples will be tested as shown <br /> on the attached copy of Minimum Verification Lab Analyses (highlighted areas). <br /> The results will determine the next step. <br /> Should the samples from the hole be clean, along with the excavated soil, the <br /> f soil will be returned. <br /> Should the hole be clean and the soil not clean, hopefully the sample result <br /> levels are low enough to allow aeration of the excavated soil on site under . <br /> permits, guidelines, and direction of the San Joaquin County Air Pollution Dept. <br /> If the level of contaminates show too high for, aeration, the soil will be trans- <br /> i ported to a proper hazardous waste facility for disposal, namely Kettleman City, <br /> or possibly a Class 2 site, such as Forward, Inc. If the soil is removed from <br /> the site, it shall be transported under proper licensure. Any manifests produced <br /> during transfer shall have a copy provided to SJLHD within 30 days. <br /> t r^, Et Taming: Sampling could be scheduled within one week following your review of <br /> ; f this work plan. Advance inspection notice of at least 48 hours will be given <br /> to SJLHD for resampling inspection. The sample analysis should be ready for <br /> your review within three weeks after they have been taken. <br /> k <br /> r <br /> Y <br />