My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
334
>
3500 - Local Oversight Program
>
PR0545484
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 9:41:31 PM
Creation date
3/10/2020 11:05:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545484
PE
3528
FACILITY_ID
FA0003714
FACILITY_NAME
LACHHAR CHEVRON*
STREET_NUMBER
334
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26115041
CURRENT_STATUS
02
SITE_LOCATION
334 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHRONOLOGY <br /> Chevron Service Station 9-1452 <br /> Page 3 <br /> 02/12/03 Date monitoring well MW-8 was installed onsite. <br /> 02/28/03 Date of CPT and Monitoring Well Installation Assessment Report <br /> submitted by SECOR. MTBE was detected in groundwater samples <br /> collected from CPT-1-66', CPT-1-91', CPT-1-116', CPT-2-75', CPT-2- <br /> 96', and CPT-2-111' at 4 gg/L, 5 gg/L, 13 µg/L, 2 gg/L, 22 µg/L, and 12 <br /> gg/L, respectively; TAME was detected in groundwater samples collected <br /> from CPT-2-96' and CPT-2-111' at 0.9 and 0.5 µg/L, respectively; and <br /> methanol was detected in groundwater collected from CPT-1-116 at 350 <br /> gg/L. <br /> 06/26/03 Date of Aquifer Test Report and Work Plan for Interim Remedial Measure <br /> submitted by SECOR. The report discussed results from a slug injection <br /> test and a 24-hour constant-discharge pumping test conducted on MW-8. <br /> SECOR proposed extracting groundwater monthly from MW-8 to mitigate <br /> MTBE in groundwater. <br /> 11/16/03 The EHD approved groundwater extraction. Monthly batch extraction <br /> began in November 2003 and ended in April 2004. <br /> 08/2004 Weekly batch extraction began and ended in May 2005. <br /> 09/14/04 Date the EHD directed that a minimum of 8,000 gallons, instead of the <br /> documented 2,000 gallons, of groundwater be extracted each month; a <br /> feasibility study be conducted to evaluate at least two alternative methods <br /> for restoring groundwater to beneficial use; a work plan be.submitted to <br /> investigate the vertical and lateral extent of soil and groundwater <br /> contamination. <br /> 11/15/04 Date of Well Search Report submitted by SECOR stating that 46 water <br /> supply wells were identified within a one-mile radius of the site, and 14 <br /> wells were identified within a 2,000-foot radius of the site. Of these wells, <br /> one municipal well was located approximately 1,500 feet east of the site, <br /> and two domestic wells were located approximately 1,500 feet north and <br /> 1,900 feet northwest of the.site. <br /> 11/15/04 SECOR proposed conducting an ozone-sparging pilot test prior to <br /> conducting a feasibility study during a telephone conversation with EHD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.