Laserfiche WebLink
S ECOR <br /> ATTACHMENT 1 <br /> FIELD AND LABORATORY PROCEDURES <br /> Soil Cuttings, Rinsate Water, and Well Development Water <br /> Soil generated during field operations will be temporarily stored onsite and covered with <br /> plastic sheeting pending characterization and disposal. Soil cuttings will be removed by <br /> CEMC's disposal contractor to an appropriate disposal facility. Water generated during <br /> steam cleaning will be temporarily stored in DOT-approved 55-gallon drums pending <br /> transport by CEMC's disposal contractor to an appropriate disposal or treatment facility. <br /> Soil cuttings and rinsate water drums will be temporarily stored onsite for approximately 4 to <br /> 8 weeks. <br /> i <br />