Laserfiche WebLink
Ms. Victoria McCartney S E C O R <br /> June 26, 2003 <br /> Page 5 <br /> With this letter, SECOR notifies SJCEHD that David Evans of SECOR will now be managing the <br /> activities performed on Chevron's behalf at this site. Please send copies of all future <br /> correspondence to Mr. Evans' attention. If there are any questions regarding this report, please <br /> contact Mr. Evans at (916) 861-0400, extension 234 or Robert J. (Bob) Cochran of Chevron at (925) <br /> 842-9655. <br /> Sincerely, DG <br /> Q <br /> SECOR International Incorporated <br /> to <br /> SCOTT r7 <br /> GABLE <br /> �✓ . No.636 <br /> p3 <br /> Barry Miller Scott E. Gable, R.G.Th Exp. Q= <br /> Staff Scientist Principal Geologist <br /> Enclosures: <br /> List of References <br /> Table 1 Groundwater Analytical Data <br /> Table 2 Calculated Hydraulic Properties <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Figure 3 Capture Zone Conceptual Model <br /> Attachment 1 Laboratory Analytical Data and Chain-of-Custody Documentation <br /> Attachment 2 Pumping Test Data and Plots <br /> cc: Mr. Robert J. Cochran, Chevron Environmental Management Company, San Ramon, CA <br /> Mr. Jim Barton, Regional Water Quality Control Board, Sacramento, CA <br /> I:\Chevron\91452\REPORTS\Aquifer Test Report and Plan for Interim Remedial Measure.doc <br />