My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004528
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
334
>
3500 - Local Oversight Program
>
PR0545484
>
ARCHIVED REPORTS_XR0004528
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 10:41:38 PM
Creation date
3/10/2020 11:10:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004528
RECORD_ID
PR0545484
PE
3528
FACILITY_ID
FA0003714
FACILITY_NAME
LACHHAR CHEVRON*
STREET_NUMBER
334
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26115041
CURRENT_STATUS
02
SITE_LOCATION
334 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOR www.secor.com <br /> INTERNATIONAL <br /> S E C O R INCORPORATED Ran Kilgore Road,Suite 100 <br /> Rancho Cordova,CA 95670 <br /> 916-861-0400 rEL <br /> 916-861-0430 Fax <br /> September 27, 2005 20CS SEP 29 PN 1: 08 <br /> Ms. Victoria McCartney E lA L'I Fi.U-1 e t,k T 7-1L NT <br /> San Joaquin County Environmental Health Department <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, California 95202 <br /> RE: June 2005 Batch Groundwater Extraction Report <br /> Chevron Service Station 9-1452 <br /> 334 East Main Street <br /> Ripon, California <br /> S�COR Project No.: 77CH.91452.05.0370 <br /> Dear Ms. McCartney: <br /> SECOR International Incorporated (SECOR), on behalf of Chevron Environmental Management <br /> Company (Chevron), presents data for the June 2005 batch groundwater extraction event at the site <br /> referenced above (Figure 1). This work was performed in accordance with SECOR's Work Plan for <br /> Interim Remedial Measures, dated ,lune 26, 2003. This work plan was approved by the San Joaquin <br /> County Environmental Health Department (SJCEHD) as indicated in their letter dated October 16, <br /> 2003 (Attachment 1). <br /> On June 7, 14, 21, and 28, 2005, Integrated Wastestream Management (IWM), under the <br /> supervision of SECOR, extracted approximately 12,200 gallons of groundwater from wells MW-6S <br /> and well MW-8 (Figure 2) using a submersible pump at a pumping rate of approximately 5 gallons <br /> per minute (gpm). Based on the data collected during this event, approximately 0.03 pound of <br /> dissolved methyl tertiary butyl ether (MtBE) was removed from the groundwater. To date, <br /> approximately 3.81 cumulative pounds of dissolved MtBE has been removed from the groundwater. <br /> Extracted groundwater analytical data and MtBE mass removal estimates are presented in Tables 1 <br /> and 2, respectively. Certified analytical reports and chain-of-custody documentation are included in <br /> Attachment 2. Field data sheets for the batch extraction events are included in Attachment 3. <br /> If you have any questions or require additional information, please feel free to contact Brian Carey of <br /> SECOR at (916) 861-0400, extension 241 or Darin Rouse of Chevron at(925) 842-9655. <br /> Sincerely, <br /> SECOR International Incorporated <br /> Bryan Rorie Brian Carey <br /> Staff Scientist Associate Geologist <br /> I:IChevronM4521REP0RTSIBatch Extraction120051June 2005 Batch Extraction.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.