My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004531
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
334
>
3500 - Local Oversight Program
>
PR0545484
>
ARCHIVED REPORTS_XR0004531
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 1:18:24 AM
Creation date
3/10/2020 11:13:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004531
RECORD_ID
PR0545484
PE
3528
FACILITY_ID
FA0003714
FACILITY_NAME
LACHHAR CHEVRON*
STREET_NUMBER
334
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26115041
CURRENT_STATUS
02
SITE_LOCATION
334 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+• Ms. Victoria McCartney S E C O R <br /> June 10, 2005 <br /> Page 3 <br /> approximately 3.18 cumulative pounds of dissolved MtBE has been removed from the <br /> groundwater. <br /> Extracted groundwater analytical data and MtBE mass removal estimates are presented in <br /> Tables 1 and 2 respectively. Certified analytical reports and chain-of-custody <br /> documentation are included in Attachment 2. Field data sheets for the batch extraction <br /> ' events are included in Attachment 3. <br /> MARCH AND APRIL, 2005 <br /> On March 1, 9, 15, 22 and 29, and April 5, 12, 19 and 26, 2005, IWM, under the supervision <br /> of SECOR, extracted approximately 28,500 gallons of groundwater from wells MW-6S and <br /> MW-8 (Figure 2) using a submersible pump at a pumping rate of approximately five gpm. <br /> Based on the data collected during this event, approximately 0.40 pound of dissolved MtBE <br /> was removed from the groundwater. To date, approximately 3.58 cumulative pounds of <br /> dissolved MtBE has been removed from the groundwater. <br /> 6& <br /> Extracted groundwater analytical data and MtBE mass removal estimates are presented in <br /> Tables 1 and 2 respectively. Certified analytical reports and chain-of-custody <br /> documentation are included in Attachment 2. Field data sheets for the batch extraction <br /> events are included in Attachment 3. <br /> GROUNDWATER CONCENTRATION TRENDS <br /> } MtBE and tert-butyl alcohol (TBA) concentrations over time in MW-6 INI, MW-6 FIN, MW-8 <br /> INI, and MW-8 FIN are presented in Figures 3 through 6. MtBE concentrations in MW-6 <br /> and MW-8 have declined since batch extraction began in November 2003. <br /> L <br /> 1A0hevron1914521REP0RTSlBatch Extractionlbatch groundwater extraction report.doc <br /> t., <br />
The URL can be used to link to this page
Your browser does not support the video tag.