Laserfiche WebLink
} Chevron Service Station 9-1452 ° <br /> Page 2 of 2 <br /> a; <br /> EHD has directed you b letter dated January 17, 2003 to conduct a well survey and <br /> I y y 4 <br /> submit the report to EHD by March 1, 2003. More than a year has elapsed and EHD has <br /> not yet received this report. Complete a well survey report of domestic, municipal, <br /> industrial and other wells within a 2,000-foot radius of this site. Contact the Department # <br /> of Water Resources, municipal water suppliers, and nearby industries for well <br /> information. Perform a physical search of the area to identify all wells. Show the <br /> location of all wells on a map, relative to the location of this site. Submit any known <br /> construction details of the wells, and identify all sources of information in the well survey <br /> report due to EHD on November 1,2004. E <br /> es collected during the cone <br /> groundwater samples � ! <br /> al results for oun p <br /> Laboratory analytic a' <br /> penetration testing(CPT) investigation have not been electronically submitted to <br /> _ <br /> GeoTracker—the State Water Resources Control Board database program. Electronic <br /> transmission of these laboratory analytical results to GeoTracker must be initiated <br /> immediately. <br /> If you have any questions regarding this letter,please contact Vicki McCartney at <br /> (209) 468-3456, or by electronic mail at vmccartney@sjcehd.com. <br /> Donna Heran,REHS, Director <br /> Environmental Health Department ! <br /> ! <br /> Vicki McCartney, RENS Nuel C. Henderson, Jr., RG <br /> ' <br /> Unit IV- Site Mitigation <br /> Unit TV-Site Mitigation <br /> c: David Evans - Secor <br /> James L.L. Barton - CVRWQCB <br /> :I, r <br />