Laserfiche WebLink
Camp Dresser & 'McKee Inc. Z568F-49k <br /> Sall- Boring Log ` �-:0 4-7� <br /> l <br /> Client Nele Foodq Site__Ripan_CA Job No. 11-IN111,P5 Surveyed Elevation:Ground_NA <br /> Date Drilled 121--99RO Well No-M-i i:3 Boring Co Top of Casing_65.45 Screen Length- 10' <br /> Piezometer trig size ype <br /> Field GeologisLA_KellKelt;IK.Black–Organic Vapor Instruments Used NA Water Table Depth <br /> Blow per <br /> Depth Samp. 6' Sample dv./ Org.Vap Strata Equipment <br /> (Feet) o. lbs. Interval ecov -PPM Sample Description Chane Installed <br /> 220-225 CLClay. Sand layer 224-224.5'. Cray <br /> 225— 5" <br /> Explorato <br /> 'I Clay to 230'. Boring <br /> go <br /> 225-230 <br /> 23 Cement/ <br /> ,S� Sandi finedaitted. ,m Silty Bentonite <br /> z3a23s sand 734-234.5'. Gaut <br /> � sand <br /> Sand as above. <br /> 235-240 <br /> 240— <br /> SZ Sand as above to 243'. <br /> 24a24s clayey sand. <br /> 24 Clayey <br /> and <br /> Clayey sand as above to <br /> 245-250 Sand to 247. Cal a ear sand <br /> to 249.51. Sand to 252. <br /> Sand <br /> 230-255 59 Clayey sand to 254'. TD=254' Clayey <br /> and <br /> 25 <br /> TD=254' <br />