Laserfiche WebLink
f <br /> November 8, I995 • <br />�I Page 3 <br /> J <br /> • Report. A report will be prepared after completion of field work <br /> The report will include bonng logs, site map, soil and groundwater <br /> analytical results, chain-of-custody documentation, and findings <br /> Field and laboratory procedures are presented as Attachment A <br /> SCHEDULE <br /> • <br /> PACIFIC is prepared to uutiate field work within 1 week of receiving approval by Chev- <br /> ron to proceed, and obtaining appropriate permits Field work is currently scheduled to <br /> be performed prior to December 1, 1995 -A report documenting the findings of the <br /> investigation is anticipated to be submitted approximately 6 weeks after completion of <br /> field work <br /> If there are any questions regarding the contents of this work plan, please call . <br /> Sincerely, <br /> Pacific Environ Intal Group, Inc. <br /> MICHAEL HURD <br /> No 0068 <br /> FI kU _GIST <br /> Michael Hur EXP <br /> Senior Geologist LP <br /> CHG 0068 qTE OF <br /> Attachments Figure 1 - Site Location Map <br /> Figure 2 - Proposed Well and Soil Bonng Location Map <br /> Attachment A - Field And Laboratory Procedures <br /> 3201591AIW'KP AN <br />