Laserfiche WebLink
I <br /> c` <br /> ;t <br /> �! N +MW-2 <br /> ii 39.64 <br /> #: SCALE (tt) 39.72 <br /> MW-1 _ <br /> FORMER WASTE ILS J � <br /> UNDERGROUND S ORAGE <br /> 30 TANK (UST) <br /> FORME PUMP ISLAND <br /> i HOIST (TYP) y <br /> MW-4 <br /> :j STATION 39.78 <br /> F I <br /> ?t BUILDING <br /> 14 <br /> 11 EXPLANATION Y / <br /> PROPOSED 12,000 <br /> MONITORING WELL GALLON UST`s v / /'✓/^} <br /> V!j <br /> 39.64 GROUNDWATER ELEVATION {FT, MSL} <br /> GROUNDWATER ELEVATION CONTOUR (FT, MSL) <br /> aAPPROXIMATE GROUNDWATER FLOW DIRECTION; <br /> APPROXIMATE GRADIENT = 0.0008 I I <br /> FORMER FUEL UST's MW-3 <br /> STRIb E KHCIK -4 x 39.73 <br /> ti i l it <br /> NO.49 i y� <br /> PREPARED BY FIGURE: <br /> Chevron Station 9-1452 <br /> ` 334 East Main Street GROUNDWATER ELEVATIONP& <br /> 1 <br /> Ripon, California CONTOUR MAP, OCTOBER 31, 1997 PROJECT:IM <br /> engineering contracting firm DAC04 <br /> li� l <br />