Laserfiche WebLink
FIELD SERVICES REQUEST <br /> SITE INFORMATION FORM <br /> Identification Proiect Type Check Appropriate Category <br /> Project# 77CH 91452 o3 0350 Operation&Maintenance Q Budget Site Visit <br /> Station ID# Chevron 91452 F] Sampling F1 Out of Budget Site Visit <br /> Site Address 334 East Main Street 1 st Time Visit <br /> Ripon,CA Quarterly Budget Hours 8 <br /> Lab Lancaster _1st _2nd _3rd _4th Actual Hours r a'-5 <br /> County San Joaquin Fx Monthly Mob/de Mob 2 <br /> Project Manager David Evans ❑ Semi-Monthly <br /> Requester Karam Parmar Bi-Weekly Site Safety Concerns <br /> Client Chevron EMC One Time Event See Health and Safety Plan <br /> Client P O C Bob Cochran Other <br /> Date of Request Feb 17,20 Field Date Z- f 7 <br /> Pre Field Activities <br /> 1 Load necessary tools and sampling equipment on truck _ <br /> Field Tasks General Description <br /> 1) Contact site engineer upon arrival (David Evans, ext 234 or Karam Parmar ext 286) <br /> 2) Review Health and Safety Plan (HASP) <br /> 3) You will be supervising IWM as they extract water from MW-8 (Approximately 6,000 gallons) <br /> IWM will be using a submersible pump to extract the water <br /> They will supply their own pump and generator <br /> 4 Check in with Station Manager <br /> 4) Set up Vac truck so it does not interfere(or interferes as little as possible) with the business <br /> 6) Prior to beginning extraction, collect manual water level measurements on MW-1, MW-2, MW-3, <br /> MW-4, MW-5D, MW-5S, MW-6D, MW-6S, MW-7D, and MW-8 <br /> Record water level measurements in the attached table Note initial totalizer reading <br /> 7) Collect groundwater sample from MW-8(no purge) <br /> 8) Instruct IWM to begin extracting water Vac truck can handle approximately 6,000 gallons <br /> 9) Collect manual measurements on above wells hourly(except MW-8) <br /> 10) When Vac truck is full, collect sample from MW-8 with the bailer Note final totalizer reading <br /> 11) Contact site engineer prior to leaving <br /> 12 Complete sample chain-of-custody time <br /> 13 Return samples to office and place in refrigerator <br /> 14 Place sample chain and field notes on Karam Parmar's desk <br /> She will prepare samples for shipping <br /> Comments 1 Remarks from Field Staff <br /> s <br /> e <br /> Completed By � ��� � � � pate 2 l SECOR <br /> international I noowratea <br /> K 5tomwHela Service Request As <br />