My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004551
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
334
>
3500 - Local Oversight Program
>
PR0545484
>
ARCHIVED REPORTS_XR0004551
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 10:25:14 PM
Creation date
3/10/2020 11:29:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004551
RECORD_ID
PR0545484
PE
3528
FACILITY_ID
FA0003714
FACILITY_NAME
LACHHAR CHEVRON*
STREET_NUMBER
334
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26115041
CURRENT_STATUS
02
SITE_LOCATION
334 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E C 0 R <br /> Ms Victoria McCartney <br /> January 23, 2004 <br /> . Page 2 ' <br /> Number of Detections Minimum Maximum <br /> Constituents above the MDL of the 10 Concentration in pg/L(Well ID) Concentration in pg/L(Well ID) <br /> Total Samples <br /> i <br /> TPHg 4 i 330(MW-5S) 3,500(MW-6S) <br /> Benzene 0 ND ND <br /> MtBE 4 3,700(MW-4) 35,000(MW-6S) {i <br /> Definitions <br /> a <br /> MDL=Method detection limit <br /> gglL=Micrograms per liter <br /> ND =Non detect <br /> BATCH EXTRACTION RESULTS <br /> Batch extraction was Initiated on November 18, 2003, following the 402003 monitoring and sampling <br /> event on November 11, 2003 Therefore, the groundwater monitoring and sampling results do not <br /> reflect the effects of monthly extraction events As of December 4, 2003, monthly batch extraction <br /> has removed approximately 0 4 pounds of MtBE Following the first quarter 2004 (102004) <br /> • monitoring and sampling event scheduled for February 3, 2004, SECOR will evaluate the <br /> effectiveness of batch extraction and if necessary evaluate the feasibility of other alternatives for <br /> restoring and protecting the beneficial uses of groundwater at the site <br /> If you have any questions or concerns regarding these activities, please feel free to contact me at <br /> (916)861-0400 extension 234 <br /> Sincerely, <br /> SECOR International Incorporated , <br /> F� <br /> A. <br /> avid M Evans <br /> Project Manager <br /> All <br /> ATTACHMENTS <br /> Attachment B— December 5, 2003, Groundwater Monitoring & Sampling Report by Gettler- <br /> Ryan Incorporated ' <br /> r <br /> I <br /> cc Mr Robert J Cochran, Chevron Environmental Management Company, San Ramon, CA <br /> Mr Jim Barton, Regional Water Quality Control Board, Sacramento, CA <br /> 11Chevron1914521Penodic Monitoring1200314Q2003 QMR 91452 doc SECOR lntematronal incorporated <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.