My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004557
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
334
>
3500 - Local Oversight Program
>
PR0545484
>
ARCHIVED REPORTS_XR0004557
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 11:47:46 PM
Creation date
3/10/2020 11:32:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004557
RECORD_ID
PR0545484
PE
3528
FACILITY_ID
FA0003714
FACILITY_NAME
LACHHAR CHEVRON*
STREET_NUMBER
334
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26115041
CURRENT_STATUS
02
SITE_LOCATION
334 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
__ F <br /> SECOR www secor com <br /> INTERNATIONAL 3017 Kilgore Road Suite 100 <br /> E C ® R INCORPORATED Rancho Cordova CA 95670 <br /> 916 861-0400 TEL <br /> 91 fi 861 0430 FAX <br /> April 24, 2003 ��V�� V <br /> MAY 0 2 2003 <br /> Victoria McCartney <br /> San Joaquin County Environmental Health Department ENVIRONMENT HEALTH or <br /> 304 East Weber Avenue, Third Floor PERMIT/SERVICES <br /> Stockton, California 95202 <br /> b <br /> RE Chevron Groundwater Monitoring Report (1 Q2003) lud <br /> Chevron Station 9-1452 �1 <br /> 334 East Main Street �t/ <br /> Ripon, California <br /> SECOR Project No 77CH 00000 09 0004 <br /> Dear Ms McCartney <br /> SECOR International Incorporated is providing this report to summarize the recently <br /> completed groundwater-monitoring event at the above referenced site The site is located at 334 <br /> East Main Street, in Ripon, California <br /> COMPLETED ACTIVITIES - FIRST QUARTER 2003 <br /> . • Conducted quarterly groundwater monitoring and sampling <br /> ■ Prepared and submitted quarterly groundwater monitoring report <br /> ■ Completed additional groundwater assessment activities, including installation of monitoring <br /> well MW-8 <br /> • Prepared report of additional groundwater assessment activities <br /> • Performed groundwater pumping aquifer test using MW-8 <br /> PLANNED ACTIVITIES - SECOND QUARTER 2003 <br /> ■ Conduct quarterly groundwater monitoring and sampling <br /> ■ Prepare and submit quarterly groundwater monitoring report <br /> ■ Prepare report of groundwater pumping aquifer test <br /> i <br /> DISCUSSION <br /> The quarterly monitoring and sampling was performed by Gettler-Ryan, Inc (G-R) This <br /> groundwater monitoring and sampling event was performed on February 12, 2003 G-R's <br /> groundwater monitoring report is included as Attachment A Depth to groundwater across the site <br /> ranged from 28 54 to 31 93 feet below ground surface Groundwater elevation across the site <br /> increased an average of 1 42 feet from the previous sampling event Groundwater flow was to the <br /> west at an approximate gradient of 0 001 ft/ft A summary of laboratory results are listed below <br /> 14Chevront9145OPenodc Mondonng120031102003 QMR 91452 doc SECOR International incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.