My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004560
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
334
>
3500 - Local Oversight Program
>
PR0545484
>
ARCHIVED REPORTS_XR0004560
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 10:53:52 PM
Creation date
3/10/2020 11:33:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004560
RECORD_ID
PR0545484
PE
3528
FACILITY_ID
FA0003714
FACILITY_NAME
LACHHAR CHEVRON*
STREET_NUMBER
334
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26115041
CURRENT_STATUS
02
SITE_LOCATION
334 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: June 28,2002 CI� <br /> 1.J CSR <br /> pf '� International Incorporated <br /> �J CHEVRON GROUNDWATER MONITORING REPORT (2Q2002) <br /> Primary Agency: Margaret Lagorio �� � <br /> San Joaquin County Public Health Services t] u <br /> Environmental Health Division ` J U L 0 1 2002 <br /> 304 East Weber Avenue,Third Floor <br /> Stockton,CA 95202 r,T <br /> ENVIROR EN l � :��_�l <br /> PERMIT/SERVICES <br /> Facility No.: 9-1452 Address: 334 East Main Street Ri on California <br /> CHEVRON Project Manager: Robert Cochran <br /> Consulting Co./Contact Person: SECOR International,Inc. —Brian Silva <br /> Consultant Project No.: 77CH.00000.00.0004 <br /> Assembly Bill 681 Status: Property Owner:Sherman Hinaman,Gridley,CA �— <br /> WORK PERFORMED THIS QUARTER Second Quarter—2002: <br /> 1. Conducted quarterly groundwater monitoring and sampling. <br /> 2. Prepared and submitted quarterly groundwater monitoring report. <br /> 3. Submitted Site Assessment Report 1 Work Plan for.Further Assessment. <br /> WORK PROPOSED FOR NEXT QUARTER: Third Quarter - 2002: <br /> 1. Conduct quarterly groundwater monitoring and sampling. <br /> 2. Prepare and submit quarterly groundwater monitoring report. <br /> 3. Perform aquifer pumping test pending approval of work plan. <br /> E <br /> E <br /> QUARTERLY RESULTS SUMMARY: <br /> Current Phase of Project: Monitoring <br /> E Frequency of Groundwater Sampling: Quqjerl� <br /> Frequency of Groundwater Monitoring: Quarterly <br /> Is Free Product(FP)Present On-Site: No <br /> Current Remediation Techniques: None <br /> Approximate Depth to Groundwater: 29.99 to 33.24 feet_ <br /> Groundwater Gradient: "Northwe 0.0003 ft/ft _ <br /> 3017 Kilgore Road, Suite 100, Rancho Cordova, CA 95670 916 861.0400 916.861.0430 Fax www,secor,cam <br />
The URL can be used to link to this page
Your browser does not support the video tag.