Laserfiche WebLink
Date: June 28,2002 CI� <br /> 1.J CSR <br /> pf '� International Incorporated <br /> �J CHEVRON GROUNDWATER MONITORING REPORT (2Q2002) <br /> Primary Agency: Margaret Lagorio �� � <br /> San Joaquin County Public Health Services t] u <br /> Environmental Health Division ` J U L 0 1 2002 <br /> 304 East Weber Avenue,Third Floor <br /> Stockton,CA 95202 r,T <br /> ENVIROR EN l � :��_�l <br /> PERMIT/SERVICES <br /> Facility No.: 9-1452 Address: 334 East Main Street Ri on California <br /> CHEVRON Project Manager: Robert Cochran <br /> Consulting Co./Contact Person: SECOR International,Inc. —Brian Silva <br /> Consultant Project No.: 77CH.00000.00.0004 <br /> Assembly Bill 681 Status: Property Owner:Sherman Hinaman,Gridley,CA �— <br /> WORK PERFORMED THIS QUARTER Second Quarter—2002: <br /> 1. Conducted quarterly groundwater monitoring and sampling. <br /> 2. Prepared and submitted quarterly groundwater monitoring report. <br /> 3. Submitted Site Assessment Report 1 Work Plan for.Further Assessment. <br /> WORK PROPOSED FOR NEXT QUARTER: Third Quarter - 2002: <br /> 1. Conduct quarterly groundwater monitoring and sampling. <br /> 2. Prepare and submit quarterly groundwater monitoring report. <br /> 3. Perform aquifer pumping test pending approval of work plan. <br /> E <br /> E <br /> QUARTERLY RESULTS SUMMARY: <br /> Current Phase of Project: Monitoring <br /> E Frequency of Groundwater Sampling: Quqjerl� <br /> Frequency of Groundwater Monitoring: Quarterly <br /> Is Free Product(FP)Present On-Site: No <br /> Current Remediation Techniques: None <br /> Approximate Depth to Groundwater: 29.99 to 33.24 feet_ <br /> Groundwater Gradient: "Northwe 0.0003 ft/ft _ <br /> 3017 Kilgore Road, Suite 100, Rancho Cordova, CA 95670 916 861.0400 916.861.0430 Fax www,secor,cam <br />