Laserfiche WebLink
ATTACHMENT C <br /> FIELD PROCEDURES <br /> Chevron Service Station 9-1452, 334 East Main Street, Ripon, California <br /> generated during steam cleaning during CPT and well installation activities will be 1 <br /> temporarily stored in DOT-approved 55-gallon drums pending transport by Chevron's <br /> disposal contractor to an appropriate disposal or treatment facility. Soil cuttings and rinsate <br /> water drums will be temporarily stored onsite for approximately 4 to 8 weeks. <br /> f <br /> i <br /> 4 <br /> I , <br /> t <br /> I i <br /> ' f <br /> I 1 <br /> 1 <br /> . 1 F <br /> t: <br /> I <br /> J <br /> I I <br /> fF <br /> 4 <br /> . t <br />