My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004563
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
334
>
3500 - Local Oversight Program
>
PR0545484
>
ARCHIVED REPORTS_XR0004563
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 11:52:41 PM
Creation date
3/10/2020 11:35:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004563
RECORD_ID
PR0545484
PE
3528
FACILITY_ID
FA0003714
FACILITY_NAME
LACHHAR CHEVRON*
STREET_NUMBER
334
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26115041
CURRENT_STATUS
02
SITE_LOCATION
334 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: January 31,2002 Ct � <br /> SU'ICE International incorporated <br /> CHEVRON GROUNDWATER MONITORING &WkiR 461d&�S <br /> Primary Agency: Margaret Lagorio <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> 304 East Weber Avenue,Third Floor <br /> Stockton,CA 95202 <br /> Facility No.: 9-1452 Address: 334 East Main Street, Ripon,California <br /> CHEVRON Project Manager: Robert Cochran <br /> Consulting Co./Contact Person: SECOR International, Inc. —William Brasher <br /> Consultant.Projecf No.: 077.43461.028 <br /> Assembly.Bill 681 Status: Property Owner: Sherman Hinaman,Gridley,CA <br /> WORK PERFORMED.THIS QUARTER: Fourth Quarter—2001: <br /> 1. Conducted quarterly groundwater monitoring and sampling. <br /> 2. Prepared and submitted quarterly groundwater monitoring report. <br /> 3. Submitted report of site assessment activities, including work plan for we I--installation. <br /> WORK PROPOSED FOR NEXT QUARTER: First Quarter - 2002: <br /> I. Conduct quarterly groundwater monitoring and sampling. <br /> 2. Prepare and submit quarterly groundwater monitoring report. <br /> 3. Perform installation of additional groundwater monitoring wells. <br /> QUARTERLY RESULTS SUMMARY: <br /> Current.Phase of Project: Monitoring K <br /> Frequency of Groundwater Sampling: Quarterly <br /> .Frequency of Groundwater Monitoring: Quarterly <br /> Is Free Product(FP) Present On-Site: No <br /> Current Remediation Techniques: None <br /> Approximate Depth to Groundwater: 32.84.to 34.70feet <br /> Groundwater Gradient: %rN_ortlr_east rr 0.0005E;ft-b, <br /> 3017Kilgore Road, Suite 100, Rancho Cordova,'CA 95670 916.861.0400 916.861.0430 Fax www.secor.corn <br />
The URL can be used to link to this page
Your browser does not support the video tag.