My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
470
>
3500 - Local Oversight Program
>
PR0545485
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 12:03:01 AM
Creation date
3/10/2020 11:41:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545485
PE
3528
FACILITY_ID
FA0003604
FACILITY_NAME
BEACON STATION #3492*
STREET_NUMBER
470
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22307101
CURRENT_STATUS
02
SITE_LOCATION
470 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T <br /> ":M"A <br /> SITE SAFETY PLAN, No. 86102-7S <br /> SUBSURFACE ENVIRONMENTAL INVESTIGATION- <br /> at the <br /> _ Beacon _Service Station No. 492 <br /> - 470 North Main Street <br /> Manteca, California <br /> _ (November 14, 1991) <br /> INTRODUCTION <br /> This Site-Safety Plan describes basic safety requirements for-the subsurface environmental <br /> -investigation. The provisions set forth in this: Plan apply to the employees of RESNA <br /> Industries and its subcontractors working on this phase of the project. The subcontractors <br /> may elect to- modify these provisions., but only to upgrade or increase the safety <br /> requirements, and only with the concurrence of RESNA, as designated and accepted in <br /> writing. <br /> This Site Safety Plan will address-the expected potential hazards that may-be encountered <br /> on the worksite for this project. Field activities are planned to begin.December 1991, with <br /> the duration estimated at approximately 30 days after the start date. If changes in site.or <br /> working conditions occur as activities progress, addenda to this plan will be"provided by <br /> RESNA. <br /> AUTHORITY FOR SITE SAFETY <br /> The RESNA personnel responsible-for project safety are the Project Manager and the Staff <br /> =. Geologist or Engineer. The Health and Safety Coordinator is responsible for the overall <br /> RESNA Health and Safety.Program and may choose. to audit the site for compliance and <br /> take appropriate action to correct deficiencies.- The. Project Manager is responsible for <br /> implementing the provisions of this Plan, for. providing a copy of this Plan to the Staff <br /> Geologist or Engineer, and-for-advising the Staff.Geologist or Engineer on health and safety <br /> matters. The Project Manager and.Staff Geologist or Engineer have the_authority to audit <br /> site activities for compliance with the provisions of this Plan. They may suspend or modify <br /> work practices or dismiss subcontractors whose conduct does not meet the requirements <br /> specified in this Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.