Laserfiche WebLink
y <br /> i sP <br /> PUMP UNIT I I <br /> SP ru•, — <br /> 55 GAL — <br /> ra m—�,e•.mu r•,w r we r.,c.r,rc <br /> , t <br /> i M --- <br /> ACCUMULATOR / H2O KNOCKOUT i <br /> i I <br /> 1 <br /> ELECTRICAL LEL I <br /> CONTROL MONITOR I { <br /> I PANEL (OPTIONAL) I I + <br /> 100 SCFM <br /> I 1 CATALYTIC INCINERATOR <br /> , aeir.nrs rrl,wl n enrr � <br /> eara+n rracnpr, <br /> ACCUMULATOR / PUMP / 100 SCFM CATALYTIC INCINERATOR <br /> t <br /> TYPICAL INSTALLATION <br /> . SPECIFICATIONS <br /> Model 510 <br /> Capacity Insulation <br /> 100 SCFM 14007 ceramic fiber <br /> Design temperature Electrical power <br /> 70011F 230 VAC, 30 Amps, 60 Hz, 3-phase standard <br /> Residence time Temperature controller <br /> 3 second Honeywell Series 2000 <br /> Catalyst conversion efficiency Chart recorder <br /> greater than 95% 2-pen Honeywell <br /> Burner type Control panel <br /> ECLIPS Ratiomatic, 5 x 106 BTU/hr capacity NEMA 4X <br /> (Typical usage < 2 x 106 BTU/hr), <br /> 15 1 Turndown ratio <br /> Burner management system Optional Equipment <br /> ECLIPS Explosion proof system <br /> Burner blower LEL Monitoring System <br /> 1/3H P TEFC 4-pen chart recorder <br /> UV Flame detector Heat exchanger <br /> 2 to 4 seconds failure response Remote data transmission system <br /> Fuel type Trailer mount <br /> Natural gas or propane Special catalyst for 98% efficiency <br /> Dimensions Sound Proofing <br /> 3'W x 3'L x 12'9"H Exhaust stack extensions <br /> (15'9"H w/3' stack extension) <br /> Inlet diameter <br /> 2" NPT Ordering Information <br /> Stack diameter • Hoy" <br /> 6" ID • Power requirements <br /> Weight • Supplemental natural gas <br /> Approx 1,000 lbs Efficiency required <br />