Laserfiche WebLink
i <br /> 11 February 1991 <br /> Project 00770.02 <br /> accur,ulator/water knockau;. device. <br /> The combustor unit and <br /> accumulator/water knockout device :'sere placed within a protectivefenced <br /> enclosure. The combustor unit was designed to destroy <br /> by combustion <br /> hydrocarbon gases in the eermittingractd lthroughbefore <br /> SanaJoaquin Countyases are rgd <br /> Air <br /> into the atmosphere. Afterr pthe system equipment was delivered to the <br /> pollution Control District, to <br /> site, installed on an equipment pad, and connectedthatth extraction <br /> system already in place. A propane trap <br /> wagonsupplemental ved as a <br /> fuel source was kept in the enclosure with the system <br /> equipment. A site plan of the extraction system and system equipment is <br /> presented in Figure 1. <br /> OPERATION, MAINTENANCE AND MONITORING <br /> The combustor unit was designed <br /> moto operate continuously <br /> e24 hours <br /> a da. } <br /> EVAX personnel periodically Po <br /> remeiiatioahesYrogress MofitthengremediatdonanalyIns additlion,influent <br /> compliance <br /> document P to ensure <br /> sampling of the exhaust stream to the atmosphere eridelines. The dextraction <br /> the system operated within permitted emission <br /> points were swhenithydrocarbonrvapornat an concentratdioniwaslreducedell rinrthe <br /> was discontinued <br /> vicinity of that well or probe. <br /> EVAX recommends that a copy <br /> of this report be submitted to Ms. Laurie A. <br /> Cotulla of the San Joaquin County Public Health Services, Environmental <br /> Health Division. <br /> If you have any questions, please do not hesitate to cal?. <br /> Sincerely, <br /> EVAX 'technologies, Inc. <br /> Christopher J. Peoples <br /> Project Engineer <br /> tw <br /> Enclosure: Site Plan <br /> Monitoring Summary <br />