Laserfiche WebLink
Ilealth and safety Plan <br /> ;. Under•gt•vund Tartk Removal _ - <br /> over-Excavation Resample <br />; <br /> IN'T'RODUCTION <br /> PURPosE AND SCOPE <br /> i The Ilealth and Safety Plan, <br /> for underground tank removal/ over.=excavation, <br /> rrovides <br /> for the protecticar of on-tlLe activities.personnnd•I 1lererequirements, <br /> iza <br /> Burin site char•acter <br /> relmnunity g <br /> ly <br /> specs fications and procedures pr•esee4 ed subtctotilir•acLors�,isitell pv�isltors and <br /> -site including employ r <br /> � persornrel on ' ,et•svrnrel. <br /> regulatory agency I ' <br /> KEY PERSONNEL <br /> IIAZARD ANALYSIS <br /> ficant risk associated with petroleum contaminated soil is <br /> 'file most signs , use of <br /> exposure to aromatic canpourtds•and cl.lrecinhalatiortlhazardiwil.ltbe minLnl.zed <br /> clothingr .eye wear, and gloves a vn-site <br /> using appropriate respiratory protective devices as ger will a by <br /> air motritoritrg. 'fire safety Coordinator/Project Manager will establish an <br /> f exclusion zone encompass limited <br /> a 50 foot radius from tate work area. <br /> Access <br /> exclrlrr this zone will be limited to required personnel. Total organic <br /> Vapors will be monitored wlthln the exclus1011 z oxlesingor thel,Iaotolo"I anon <br /> j detector• (Pli)) calibrated for benzene lite <br /> h drocarbons• Cut•r•ent enforceable and reef(edeine7able�lure litnitatl�s. <br /> Y <br /> for potential site contaminants are pr es <br /> . i <br />