Laserfiche WebLink
TL #791-199-10 Page 2 <br /> Scope of Work <br /> Two soil borings were drilled on January 16, 1992 at the east and i <br /> west end of the former UST site. Soil boring B-1 was drilled at- <br /> the east end of the UST and soil sample S-1A (Exam No. 692-0307 . 1) <br /> was obtained at a depth of 13 .5 to 14 . 0 feet BSG. Soil boring B-2 <br /> was drilled at the west end of the UST and soil sample S-2A (Exam i <br /> No. 692-0307 .2) was obtained at a depth of 13 . 0 to 13 .5 feet BSG. <br /> Site drilling was conducted per Twining' s work plan and samples <br /> were collected under -the observation of SJCDHS personnel . Upon <br /> completion of the drilling operation, the soil borings were <br /> backfilled with a sand-cement slurry. In addition to the two soil <br /> samples, one composite sample was obtained from the drill cuttings . <br /> This sample is labeled S-3, soils pile (Exam No. 692-0307 . 5) . <br /> The results of soil sampling analysis along with the site plan, <br /> chain of custody documentation, and. soil boring logs are attached <br /> to this report. <br /> If you should have any questions regarding the information <br /> contained within this report, please do not hesitate to contact our <br /> office. <br /> Sincerely, <br /> THE TWINING LABORATORIES, INC. <br /> Matthew L. Bullis, RCE <br /> Modesto Branch Manager <br /> i <br /> cc: SJCDHS <br /> Fiorre Development <br /> I <br /> i. <br /> B:\CRISP\FIORRE 791.199.10 <br /> 2.4.2 - RV: ORIG/pjd/d#1 <br /> Fresno Modesto Visalia Bakersfield <br />