Laserfiche WebLink
UNIT IV LOP <br /> LTCP NO FURTHER ACTION (NFA) CLOSURE CHECK LIST <br /> 8120/13 <br /> SITE ADDRESS: 2224 DATE: / a <br /> SITE NAME: LOP STAFF: V iak ; t C�AY�IZ eel <br /> NP1 REQUEST FOR CLOSURE (AKA NFA) up loaded into GT by RP/consultant, within 60 days LOP staff reviews and <br /> receipts ESI with link to regulator's response in GT. If Staff verifies site meets LTCP closure criteria, then gain PG's <br /> concurrence. PG save LTCP check list as "FINAL", "READY/ELIGIBLE FOR CLOSURE"in GT. <br /> 5tct+e Waf911 00a.-at Cu t=' nof;f;eW t-he 6NJD -}hai'-t1s c4jQ u4rra�fl c/oSv io <br /> es� <br /> 9/2G//f1 LOP Staff verified GeoTracker(GT) "Closure Review" screen still marked ` !,-4-464hi�se Re <br /> n+,*4uj - UpG, -�1i�i6/G �a-r L'losc�re� <br /> , LOP Staff advises CVRWQCB of NFA consideration to prepare for Unit meeting. <br /> /p/ 3 LOP Staff asks RP consultant's for Tri-Regional Appendix A submittals to GT of: Time to reach WQG, Initial and <br /> J removed mass estimates, soil vapor study (if applicable). Submittals received on: RB notified on <br /> 9 0 / LOP staff and PG/PC discuss NFA and LTCP READY FOR CLOSURE consideration with CVRWQCB a Unit Meeting, <br /> by phone, or e-mail. RB informally concurs on�rho/lel /RB requires: NA. <br /> to concur w/closure. <br /> la jl5jl� LOP Staff drafts Case Closure Summary (CCS) and CCS is reviewed by 'third party' staff member: <br /> /o•2---1ST LOP Staff prepares 30-day notification letter to CVRWQCB of intention to issue an NFA that includes the CCS. <br /> /a - 2.2-Al LOP Staff submits 30-day CVRWQCB letter w/CCS and file to PC for review and signature. <br /> CVRWQCB 30-day response date up on: U-2_4-/ concurrence received on: 10 29 1'1 RB requests extension <br /> to: . Non-concurrence letter from CVRWQCB Management received on: Staff up loads EHD letter <br /> to CVRWQCB withgo*CCS and CVRWQCB concurrence for closure letter in GT on <br /> 11/4/14 Staff or consultant prepares 60 day Public Participation Notice (PPN). <br /> lUlb/IH Finalized PPN sent/ posted notifying effected properties and adjacent properties. 60 days up on f <br /> I1jJb1I,A PPN sent to f city/county Building Dept& , water purveyor. 60 days up on a '7 <br /> S VII> Name &Address list of all recipients (confidential) and PPN filed in LOP file. PPN up loaded into GT on I I/in] 4 <br /> I M1114 Documentation received, filed, and flagged that indicates the"current record owner(s) of fee title to the site have <br /> been notified", per Section 25297.15 (a). The NFA closure letter may not be issued without this documentation. <br /> LOP Staff directs RP to destroy all MWs, remove all waste material & provide documentation of proper waste <br /> disposal. LOP staff reviews and approves work plan for well destruction. <br /> MW Destruction permits issued (after 60 days of PPN) & Johnny notified of impending work. <br /> 330 l S LOP Staff documents destruction of all MW. GT "Groundwater Monitoring" screen updated to indicate wells are <br /> destroyed. The NFA closure letter may not be issued until MWs are destroyed. <br /> L_LOP Staff verifies and flags documentation received indicating all ort-site caste material removed and properly <br /> disposed and verified with EHD accounting all SR& D site fees have been paid. The NFA closure letter may <br /> �( not be issued without this documentation. GT"Closure Review" screen marked "Yes" at"Is This Case Ready <br /> for Closure?" <br /> LOP Staff asks clerical to prepare NFA & CCS for Director's signature within 30 days of MW destroyed and <br /> waste material properly disposed, & provides RPs name and addresses to be sent original NFA. PG/PC <br /> reviews file with flagged documents and approves issuance of NFA letter by Director. Signed CCS and NFA <br /> are copied. Originals mailed to RPs. Copies filed into LOP File, PC, and staff to upload into GT. <br /> Clerical staff updates Envision to reflect site is Closed. <br /> LOP staff pulls all site files for clerical staff to file in LOP Closed File cabinets, until scanned into Questys. <br /> LOP staff updates GT "Project Information" screens to reflect site status as Closed. <br />