My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
2224
>
3500 - Local Oversight Program
>
PR0545512
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 3:41:59 AM
Creation date
3/10/2020 1:42:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545512
PE
3526
FACILITY_ID
FA0003679
FACILITY_NAME
CALIFORNIA STOP*
STREET_NUMBER
2224
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16313007
CURRENT_STATUS
02
SITE_LOCATION
2224 MANTHEY RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 February 2006 <br /> AGE-NC Project No. 05-1256 <br /> Page 3 of 10 <br /> site by AGE utilizing a van-mounted Geoprobe 5400 direct-push probing unit equipped with _ <br /> 1.25-inch probing rods. The borings were advanced to depths of 25 feet and 26 feet bsg. A total of <br /> seventeen soil samples were analyzed for petroleum hydrocarbon products. TPH-g was detected in <br /> soil samples collected from borings B 1 through B3 at concentrations as high as 29 mg/kg,in sample <br /> B3-20;MTBE was detected in all soil samples except B5-20 and B6-25 at a concentrations as high <br /> as 25 mg/kg (B3-20); JTAME was detected samples B1-15, 131-25, 132-15, and B3-15 at <br /> concentrations as high as 0.038 mg/kg(132-15); and Xylenes were detected in soil sample B2-25 at <br /> a concentration of 0.022 mg/kg. <br /> Grab ground water samples were collected from first-encountered ground water from soil borings <br /> B 1 through B6 and analyzed for petroleum hydrocarbon products. TPH-g was detected in ground <br /> water samples BI through B3 at concentrations as high as 86,000 micrograms per liter (µg/1) in <br /> boring 132; MTBE was detected in samples B 1 through B3 and B6 at concentrations ranging from <br /> 75 pg/l (B6)to 55,000 µg/1 (B2); TAME was detected in samples Bl through B3 at concentrations <br /> as high as 120 µg/l in B1;and BTEX constituents were detected in samples B2 and B3 at maximum <br /> concentrations in sample B3 of 110 µg/1 benzene, 390 pg/l toluene, 270 gg/l ethylbenzene, and �r <br /> 680 µg/l xylenes. The plume of dissolved MTBE and TPH in ground water is defined to <br /> non-detectable levels north of the upgraded dispenser area. <br /> 2.3. STRATIGRAPHY <br /> From surface grade to approximately 4 feet bsg, dark brown to black, dry to slightly moist organic <br /> topsoil was encountered throughout the site, generally underlain by a layer of brown, moist sandy <br /> silt and sand to approximately 13 feet bsg. From 13 feet to between 20 feet and 23 feet bsg,brown, <br /> dark brown,and gray-brown clayey silt and silty clay were identified. A '/2-foot to 1-foot thick layer <br /> of clayey sand and sandy clay occurred throughout most of the southern portion of the site at a depth <br /> of approximately 20 feet to 24 feet bsg, underlain by silty sand and sand to the total depth of the <br /> borings (25 feet to 26 feet bsg). <br /> 3.0. SCOPE OF WORK <br /> The proposed scope of work is to assess the vertical and lateral extent of hydrocarbon-impacted soil <br /> and ground water at the site. The assessment includes the following tasks: <br /> • Permitting and pre-field work activities; <br /> • CPT drilling and sample collection; <br /> • Laboratory analysis of soil and grab ground water samples; <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.