Laserfiche WebLink
MEM0RANDUh -o-, <br /> CAUFORNIA REGIONAL WATER QUALITY CONTROL BOARD • CENTRAL VALLEY REGION <br /> 3443 Routier Road, Suite A Phone: (916)255-3000 <br /> Sacrarrjento, Califomia 95827-3098 CALNET: 8-494-3000 <br /> TO: B,EAr FROM: Heidi Barr <br /> erground Tank Unit <br /> DA 27 July 1995 SIGNATURE: 4� <br /> sUBJEC'T: REQUEST FOR CLOSURE FOR LINDEN UNIFIED SCHOOL DISTRICT BUS <br /> GARAGE, 18351 EAST MAIN STREET, LINDEN, SAN JOAQUIN COUNTY <br /> San Joaquin County Public Health Services (County) closed the site in October 1994. A <br /> complete closure report was not submitted, and the Appendix B checklist could not be <br /> completed. However,we received a Local Oversite Program (LOP) closure checklist <br /> completed by the County. Our file for the site contains only an unauthorized release <br /> form (URF), the County notification of hazardous waste discharge,the County notice of <br /> reimbursement and the County closure letter and checklist. We have no other <br /> correspondence for the site. <br /> Three slant borings were drilled in December 1989, after a failed tank test and soil <br /> analyses indicated contamination. The concentrations of contamination were not <br /> provided. Two 10,000 gallon diesel fuel tanks,one 2,000 gallon gasoline tank and <br /> approximately 500 cubic yards of contaminated soil was removed from the site. The <br /> exact date of the excavation is unknown. The URF was filed in March 1990, and the <br /> County wrote a notification of hazardous waste discharge in May 1990. <br /> The County closure checklist states that 500 cubic yards of excavated soil was aerated on- <br /> site. Up to 0.009 parts per million (ppm)benzene and 0.021 ppm toluene remain in place. <br /> The estimated amount of contamination remaining is 0.069 pounds of benzene and 0.161 <br /> pounds of toluene. The estimated depth to ground water is 105 to 110 feet below ground <br /> surface. <br /> HB <br /> Based on the low concentrations and low volume of contamination remaining and the <br /> completion of the LOP closure checklist,staff concurs with no further action. <br /> r <br /> sDJ�� <br />