Laserfiche WebLink
,. n <br /> IS <br /> 1 <br /> Waterwork <br /> Quality Assurance and Qua_ lite Control Plan <br /> �. The Remedial Investigation (RI) quality Assurance/Quality Control <br /> (QA/QC) program is intended to facilitate the acquisition of <br /> { accurate and reliable data. Environmental data <br /> the IZI will be collected and analyzed following pro athered during <br /> Prescribed in the Quality Control Pro rain. A g procedures <br /> .. Program has been established to assure that the uality Assurance <br /> Quality Control <br /> Program is effective. Both Programs are necessary to provide <br /> �-- accurate data and documentation for investigations and laboratory <br /> analyses. The l°ollowing field and laboratory ,procedures will be <br /> implemented to enaure that QA/QC objectives are mat. <br /> 1.0 Field QA/QC Plan <br /> The Field QA/QC Plan includes <br /> Protocols for: <br /> Data Collection <br /> l Equipment Decontamination <br /> - Soil Sampling <br /> Groundwater sampling <br /> a g <br /> - Groundwater monitoring <br /> - Well development <br /> The following descriptions are general. summaries of the <br /> QA/QC procedures for field activities. <br /> I3^,tailed sampling <br /> E procedures are described in the attached <br /> r <br /> protocols. This section presents sampling procedures <br /> relating to QA objectives. <br /> f"j <br /> All information pertinent to the field investigation will be <br /> sept in a field log book. Information to be documented <br /> includes at least the following: <br /> � 1 <br /> Sample numbers <br /> ~� Locations of sample collection <br /> Sold boring or well n_umbers, as--applicable ----_ ------- ---- ----- <br /> - -- -- <br /> a Depths at which samples were obtained . <br />