Laserfiche WebLink
' r H <br /> S <br /> J� <br /> ` PRECISION <br /> 'INDUSTRIES <br /> i � <br /> INC. <br /> SEPTEMBER 11, 1986 <br /> GENERAL <br /> ENGINEERING <br /> CONTRACTORS <br /> S E R C E LINDEN UNIFIED SCHOOL DISTRICT <br /> riMAINTENANCE 100 N. JACK TONE ROAD <br /> LICENSE NO. 467293 LINDEN, CA 95236 <br /> ATTENTION: FRANK HUBBART <br /> LO^.ATION: BUS GARAGE, 18351 E. Main Street; Linden <br /> E RESULTS OF TANK TEST PERFORMED SEPTEMBER 8, 1985 <br /> TANK #1 - 10,000 gallon diel fl tank - € <br /> sefuel r <br /> Tank was completely isolated from all <br /> lines. We tested tank only at full <br /> pressure, <br /> Q A <br /> Full pressure tank only test indicated a. <br /> .r, volume change of -.148 gallons per hour <br /> under test conditions. <br /> Tank failed state guidelines. <br /> PRECISION INDUSTRIES INC. I <br /> WARREN DEE FOWLES <br /> FIELD SUPERINTENDENT i <br /> WDF/psw } <br /> n 2191 NAVY OR.,STOCKTON,CALIFORNIA 95206 209 IA62-9911 $001332.5900 <br /> t <br />