Laserfiche WebLink
TABLE OF CONTENTS <br /> 1.0 HEALTH AND SAFETY PLAN I <br /> 1.1 Personnel Responsibilities 1 <br /> 1.2 Project Manager (PM) I <br /> 1.3 Project Safety Officer (PSO) 1 <br /> 1.4 Project Employees 2 <br /> 1.5 Speciallnstructions 2 <br /> 2.0 SAFETY IMPLEMENTATION 3 <br /> 2.1 Personnel Protective Equipment (PPE) 3 <br /> 2.2 General Safety 4 <br /> 2.3 Daily Safety Meetings 4 <br /> _ 2.4 Safety Log 4 <br /> 2.5 Eating, Drinking, Smoking 4 <br /> 2.6 Safety Plan Aclatowledgment Sheet S <br /> 3.0 EMERGENCY CONTINGENCY PLANS <br /> 3.1 Emergency Conditions S <br /> 3.2 Energency Procedures 5 <br /> 3.3 General First Aide Treatment 6 <br /> 4.0 DECONTAAMVATION PROCEDURES 7 <br /> 4.1 Personnel Decontamination 7 <br /> 4.3 Personnel Decontamination Station Closure 8 <br />