Laserfiche WebLink
JAMAR SERVICE <br /> Page 1 of 1 <br /> Path to Closure Plan GG <br /> OTRn N RHON IMgNnp p �cR PORTe SEB@(ib LOGOIfr <br /> JAMAR SERVICE(70507700858)-MAP THIS SITE <br /> OPEN-REMEDIATION <br /> 4075 MAIN ST E <br /> STOCKTON CLEANUPO CA 95209 ACTIVITIES REPORT TA A I <br /> SAN JOAQUIN COUNTY SAN JOgpUIN COUNTY LOP(LEgpf-CASE#,.1667 <br /> PUBLIC CWEBPAGE CASEWALLEY:MCS(REGION S)- MARIN-SUPERVISOR:ADRIENNE ELL5AE55EF <br /> VIEWPRINi F eSUMMARYFOR THISSITE CENTRAL VALLEYRWOCB(REGION 5S)-CASE Y'391042 <br /> CASEWORKER:JAMES BARTON-SUPERVISOR:CORI CONDON <br /> CU82 <br /> F Claim CUFPdodty Aatlpned:C CUF Amount Paid;$11298pp <br /> THIS PROJECT WAS LAST MODIFIED BY ANGELICA SANDOVAI MARIN ON fill&2014 8:5]:08 AM-HISTORY <br /> THIS SITE HAS SUBMITTALS.CLICK XERE TO OPEN A NEW WINDOW WITH THE SUBMITTAL APPROVAL PAGE FOR THIS SITE <br /> Path to Closure Plan THIS VERSION IS FINAL AS OF 1211041013 PATH TO CLOSURF HISTORYGUESS RESET eATH <br /> TO CLOSURE PLAN <br /> IMPEDIMENT 1: <br /> General Criteria E:A conceptual site model that assesses the and mobility extent t, ty of the release <br /> �> has NO7 been developed <br /> r Procetlurel Impetliment-INFO <br /> sta to Resolve Im atliment 1-SIe 1:- LE S <br /> Groundwater flow direction commonly toward north to NNE: additional plume delineation needed toward the COMPLETION DATE <br /> NE. <br /> P OJEC DDA CIDgL GATE <br /> 1]1112014 <br /> ADD ADD ADDITIONAL STE_ <br /> IMPEDIMENT 2: <br /> ZI General Criteria F:Secondary source has NOT been removed to the extent practicable <br /> ❑ Procedural lmpedlment-M <br /> Ste to Resolve lm etliment2-Ste 1:-DEL S <br /> Thla site is currently undergoing remediation with SVE and Ozone Injection systems. COMPLETION DATE <br /> PROJECTED DAIS ACTUALP TE <br /> ADD ADDITIONAL STEP <br /> IMPEDIMENT 3: <br /> Media-Specific Criteria,Groundwater:The contaminant plume that exceeds water quality objectives Is <br /> L] Procedural Impediment-Igo <br /> NOT stable or decreasing In areal extent,and does NOT meet all ofthe add tionat charecteristics of one of <br /> �J the five classes of sites. <br /> Conditions that do not meet the policy criteria: <br /> • Plume Length(That Exceeds Water Quality Objectives):t 250 Feet and<1,000 Feet <br /> • MTBE Concentration:2 1,000 pgtl <br /> • Nearest Supply Well(From Plume Boundary):>250 Feet and 5 1,000 Feet <br /> SM to Resolve lm EimenIS-Sts L- STEP <br /> complete sve and Isco remetliation currently implementetl. COMPLETION DATE <br /> D I�ACi pLDq� <br /> 12/152015 I <br /> ADD ADDITIONAL STEP <br /> REQUIREMENTS ALONG PATH TO CLOSURE <br /> PUBLIC WELL <br /> BATE IDENTIFIED RPNOTIFICATION PARTICIPATION DESTRUCTION WASTE DISPOSAL LAND USE SITE CLOSURE <br /> I FOR CLOSURE' (CLOSURE INITIATED BY I DATE COMPLETION DATE DATE DATE IRREESTRICMO�N DATE DATE <br /> •Data IdentHled for Cloaum Ia IM1e date all impediments to clasum M1ava bean removetl <br /> Save Form as Partial] Completed Save Form as Complete <br /> LOGGED IN AS A MARIN <br /> CONTACT G99IMCKPR HELE <br /> CA- as�� <br /> https://geotracker.waterboards.ca.gov/regulators/screens/closure_policy.asp?global_id=TO... 7/17/2014 <br />