My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005182
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
3500 - Local Oversight Program
>
PR0545509
>
ARCHIVED REPORTS_XR0005182
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 5:14:25 PM
Creation date
3/10/2020 3:41:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005182
RECORD_ID
PR0545509
PE
3528
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
02
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0V4&TC <br /> • ASSOCIATES I NC , <br /> Groundwaterarameter <br /> p s of pH, temperature, clarity and conductivity were noted at <br /> approximately 5 minute intervals until successful stabilization occurred, or the wells went dry. <br /> Groundwater well development logs are contained in Attachment 1. <br /> CONCLUSIONS <br /> Concentrations of petroleum hydrocarbons detected in the groundwater samples collected from <br /> MW6a and MW7a indicate the hydrocarbon plume extends offsite in the shallow aquifer. <br /> Petroleum hydrocarbons detected in groundwater samples collected from MW6b, MW6c, <br /> MW7b, MW7c, and MW10b indicate the hydrocarbon plume extends offsite to the east in deeper <br /> groundwater. <br /> RECOMMENDATIONS <br /> Subsurface investigation activities, including the installation of off-site groundwater monitoring <br /> wells and interim remediation system installation activities will be detailed in a separate report. <br /> Based on the results of the second quarter 2004 monitoring episode, we recommend the <br /> following: <br /> Conduct the third quarter 2004 groundwater monitoring and sampling of wells MW1 <br /> through MW10c and EW1 and analyze the samples for TPHg, TPHd, BTEX MTBE, <br /> ETBE, DIPS, TBA, TAME, 1,2-DCA, and EDB. <br /> Please contact our office at(209) 579-2221 if you have any questions or comments. <br /> Respectfully submitted, <br /> ATC Associates 111c, <br /> Mike Luksic, R.G. "=�'"= <br /> Staff Geol gist : <br /> l <br /> Drew Van Allen <br /> Senior Project Manager <br /> A <br /> - <br /> - <br /> CA Registered Civil Engineer No. 47410 otr y` <br /> attachments <br /> S A268231QM reports12004 2QR.doc 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.