Laserfiche WebLink
SECOND QUARTER 2003 <br /> GROUNDWATER MONITORING REPORT <br /> AND ADDITIONAL ASSESSMENT REPORT <br /> JA LAR OIL DISTRIBUTION <br /> JUNE 2003 <br /> PREPARATION OF REPORT <br /> Firm Preparing Report <br /> GHH Engineering, Inc. <br /> 11960 Heritage Oak Place #2B <br /> Auburn, California 95603 <br /> Report Prepared By: <br /> This report was prepared by GHH Engineering, Inc. W. Thomas E. Ballard (RG#7299), Principal <br /> Geologist, is the qualified person responsible for overseeing this project. This report was written by <br /> Mr. James Peeler, Staff Geologist, and reviewed for technical content by Mr. Ballard. <br /> The analyses, conclusions and recommendations submitted in this report are based upon the best <br /> available information obtained from the field investigation, persons knowledgeable about the site <br /> �1 and local government agencies. However, the regulatory agencies may have additional <br /> recommendations after they have reviewed and evaluated the report. This report was prepared to <br /> assist Jamar in the evaluation of the site. <br /> This report has been reviewed by the client and they are responsible for the findings herein. If you <br /> have any questions or need additional information, please contact Mr. Ballard at(530) 886-3100. <br /> Thank you, <br /> �� /�AL <br /> r <br /> i <br /> James Peeler Thomas E. Ballard, R.G. <br /> Staff Geologist Project Manager <br /> PC: Mr. Marty Hartzell, CVRWQCB (Regional Board) o <br /> Ms. Lori Duncan, San Joaquin County dt cN <br /> Mr. David Irey, Esq., Office of District Attorney THOWS F BAURD <br /> NO 72x9 <br /> N <br /> F:15187UP11n1QNWndQtr2003&AAR 9�E` Q <br /> OF CAL1F0 <br />