My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005184
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
3500 - Local Oversight Program
>
PR0545509
>
ARCHIVED REPORTS_XR0005184
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 7:33:30 AM
Creation date
3/10/2020 3:42:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005184
RECORD_ID
PR0545509
PE
3528
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
02
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOND QUARTER 2003 <br /> GROUNDWATER MONITORING REPORT <br /> AND ADDITIONAL ASSESSMENT REPORT <br /> JA LAR OIL DISTRIBUTION <br /> JUNE 2003 <br /> PREPARATION OF REPORT <br /> Firm Preparing Report <br /> GHH Engineering, Inc. <br /> 11960 Heritage Oak Place #2B <br /> Auburn, California 95603 <br /> Report Prepared By: <br /> This report was prepared by GHH Engineering, Inc. W. Thomas E. Ballard (RG#7299), Principal <br /> Geologist, is the qualified person responsible for overseeing this project. This report was written by <br /> Mr. James Peeler, Staff Geologist, and reviewed for technical content by Mr. Ballard. <br /> The analyses, conclusions and recommendations submitted in this report are based upon the best <br /> available information obtained from the field investigation, persons knowledgeable about the site <br /> �1 and local government agencies. However, the regulatory agencies may have additional <br /> recommendations after they have reviewed and evaluated the report. This report was prepared to <br /> assist Jamar in the evaluation of the site. <br /> This report has been reviewed by the client and they are responsible for the findings herein. If you <br /> have any questions or need additional information, please contact Mr. Ballard at(530) 886-3100. <br /> Thank you, <br /> �� /�AL <br /> r <br /> i <br /> James Peeler Thomas E. Ballard, R.G. <br /> Staff Geologist Project Manager <br /> PC: Mr. Marty Hartzell, CVRWQCB (Regional Board) o <br /> Ms. Lori Duncan, San Joaquin County dt cN <br /> Mr. David Irey, Esq., Office of District Attorney THOWS F BAURD <br /> NO 72x9 <br /> N <br /> F:15187UP11n1QNWndQtr2003&AAR 9�E` Q <br /> OF CAL1F0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.