Laserfiche WebLink
F <br /> . THIRD QUARTER,2002 <br /> GROUNDWATER MONITORING REPORT <br /> JAMAR OIL DISTRIBUTION <br /> NOVEMBER 2002 <br /> In December 1998 two 6,000 gallon and one 10,000 gallon gasoline USTs were excavated and <br /> removed from the site and replaced with a two compartment 20,000 gallon UST meeting EPA <br /> and State of California upgrade requirements Soil samples taken in conjunction with the tank <br /> removal contained detectable concentrations of petroleum hydrocarbons and on January 27, <br /> 1999, an Unauthorized Release form was filed with the County An additional Unauthorized <br /> Release was filed with the Country on June 11, 1999 <br /> In response to a directive from the County,John P Cummings & Associates(JPCA)conducted a <br /> subsurface investigation on September 8-9, 1999,by installing and sampling three monitoring <br /> wells(MW-1, MW-2, and MW-3) MW-1,MW-2, and MW-3 were drilled to approximately 78 <br /> feet bgs, 74 feet bgs, and 74 feet bgs,respectively and sampled every 5 feet Groundwater <br /> samples were collected from the three wells on September 23, 1999 <br /> On August 21, 2000, JPCA did a finther subsurface investigation by drilling and sampling one <br /> soil boring(B1) and mstallmg and sampling two additional monitoring wells (MW-4 and <br /> MW-5) The soil boring was drilled to approximately 115 feet bgs and sampled every 5 feet <br /> f MW-4 and MW-5 were drilled to approximately 75 feet bgs with soil samples collected every 5 <br /> . feet Groundwater samples were collected from MW-1,MW-2,MW-3,MW-4 and MW-5 on <br /> August 30, 2000 The results of this investigation are documented in JPCA's 2'"{ Phase II <br /> Environmental Assessment Report dated October 25,2000 <br /> GHH assumed environmental consulting responsibilities for the site in July 2001 <br /> In Apn12002, GHH Submitted an Additional Assessment Workplan in response to County <br /> directives for additional investigation at the site The County approved the workplan in a letter <br /> dated May 28, 2002 <br /> SCOPE OF WORK <br /> Groundwater monitoring and sampling activities were conducted at the site on June 11, 2002 <br /> The following is a brief summary of the scope of work authorized by JAMAR <br /> Measure depths to groundwater in monitoring wells MW-1 through MW-5 <br /> Purge a minimum of three equivalent well volumes of groundwater from each of the <br /> wells and monitor for pH,temperature and conductivity <br /> Collect groundwater samples from the monitoring wells <br /> • Analyze water samples from the five monitoring wells for total petroleum <br /> hydrocarbons as gasoline and TPH G, benzene, toluene, ethylbenzene, and xylenes <br /> (BTEX), 8260 Oxygenates (MTBE, TBA, DIPE,ETBE,TAME),EDB, and 1,2 <br /> DCA <br /> 2 <br />