Laserfiche WebLink
SITE SAFETY PLAN <br /> CLIENT: Jamar Oil Distribution <br /> JOB LOCATION: Jamar Service <br /> 41East Main Street <br /> 0Kon, California <br /> PLAN PREP Thomas E Ballard DATE: May 2002 <br /> APPROVED BY: Gary H Hall ? DATE: May 2002 <br /> OBJECTIVES: Drill three groundwater monitoring wells to 75-feet bgs <br /> DATE(S) OF INVESTIGATION: Pending Workplan Approval <br /> SAFETY SUPERVISORS: GHH: Gary H Hall, P E ? <br /> ON-SITE: James Peeler <br /> SUBCONTRACTOR: Pending ? <br /> ON-SITE HAZARDS: Soil and groundwater pot t y contaminated with petroleum <br /> hydrocarbons,overhea derground utilities, and high traffic <br /> area <br /> SITE CONTROL: Delineators and appropriate barricades to direct away from work <br /> area <br /> PERSONAL PROTECTIVE EQUIPMENT: Level D-Gloves, steel toed boots,hard hats, <br /> coveralls&respirator with organic <br /> cartridges on-site. On-site personnel will be <br /> Level C certified and have PPE on-site <br /> SURVEILLANCE EQUIPMENT: Photoionization Detector <br /> DECONTAMINATION PROCEDURES: Personal- Wash hands eating, <br /> dnnkmg, smoking an leaving site, <br /> clean clothes and re r <br /> Equipment- Clean equipment before <br /> leaving site <br /> � I <br /> F <br />