Laserfiche WebLink
SITE SAFETY PLAN <br /> CLIENT Jamar Oil Distribution AP <br /> JOB LOCATION Jamar Service <br /> 4075 East Main Street <br /> Stockton,California <br /> PLAN PREPARED BY Thomas E Ballard DATE:December 12,2001 <br /> APPROVED BY Gary H Hall DATE-December 12,2001 <br /> OBJECTIVES Drill three groundwater monitoring wells to 75-feet bgs <br /> DATE(S)OF INVESTIGATION: December.2001 <br /> SAFETY SUPERVISORS GHH Gary H Hall,P E <br /> ON-SITE. James Peeler ? <br /> SUBCONTRACTOR Fisch Environmental <br /> ON-SM HAZARDS Soil and groundwater potentially contaminated with petroleum <br /> hydrocarbons,overhead and underground utilities,and high traffic <br /> area <br /> SITE CONTROL Delineators and appropriate barricades to direct away from work <br /> area <br /> PERSONAL PROTECTIVE EQUIPMENT. Level D-Gloves,steel toed boots,hard hats, <br /> coveralls&respirator with organic <br /> cartridges on-site On-site personnel will be <br /> Level C certified and have PPE on-site <br /> SURVEILLANCE EQUIPMENT- Photoiomzation Detector <br /> DECONTAMINATION PROCEDURES Personal-Wash hands prior to eating, <br /> drinking,smoking and before leaving site, <br /> clean clothes and respirator <br /> Equipment-Clean equipment before <br /> leaving site <br /> I <br />