Laserfiche WebLink
! YV/, <br /> A s s o C 1 A 7 E 5 I N C <br />! 5.0 CONCLUSIONS <br />! TPHg detected in the groundwater samples collected from MW6a indicates the hydrocarbon <br /> plume extends offsite in the shallow aquifer. MTBE detected in groundwater samples collected <br /> from MW6b, MW6c, MW7a, MW7b MW7c, and MWIOb indicate the MTBE plume extends <br /> ' offsite to the east in deeper groundwater. MTBE concentrations in MW7a and MW7b are below <br /> action levels. MTBE concentrations in MW6b and MW6c increased when compared with the <br /> December 13, 2004 groundwater monitoring event. <br /> BTEX components were not detected during the March 16-17, 2005 event in MW I, MW4, MWS, <br /> ' MW6a, MW6b, MW6c, MW7a, MW7b, MW7c, MW8, MW9a, MW9b, MW9c, MW10a, <br /> MW 10b and MW 10C. Although benzene, toluene, ethylbenzene and/or xylenes were not <br /> detected in MW1 during the March 16-17, 2005 monitoring event, these components were <br /> ' detected during first quarter in the earlier system monitoring events. Benzene, toluene, <br /> ethylbenzene and/or xylenes were detected in MW2, MW3 and EW1 during the March 16-17, <br /> 2005 event. <br /> ' Benzene appears to be declining or cleaned-up due the C-SpargeTM operation in MW1, MW2, <br /> MW4 and possibly EW-1. DO also increased significantly after system start-up in MW1 from <br /> 0.36 mg/L on 3 June to 5.17 mg/L during the March 16-17, 2005 event suggesting a further <br /> correlation. <br /> ' System effectiveness with respect to MTBE in the Jamar on site wells appears to be positive for <br /> MW 1. The responses (i.e., destruction of MTBE) to the system operation for MW2 and MW4 <br /> are not as clear. <br /> 6.0 RECOMMENDATIONS <br /> ' Based on the results of the First Quarter 2005 monitoring episode, ATC makes the following <br /> recommendations: <br /> ' ■ Conduct second quarter groundwater monitoring and sampling of MW through MWIOC <br /> and EWI and analyze the samples for TPHg, BTEX, MTBE, ETBE, DIPE, TBA, TAME, <br /> ' 1, 2-DCA and EDB. <br /> ■ Conduct monthly groundwater monitoring and sampling for field parameters including <br /> DO and ORP in the on-site remediation well network (MW1 —MW5, MWS and EW1) <br /> ' Continue operation and monitoring of the C-SpargeTM system for existing parameters and <br /> include electrical meter readings. <br /> ■ Install a system flow meter. Evaluate system flow on IW5 and install individual flow <br /> meters if necessary. <br /> ■ Increase the operating times of the deeper injection points and decrease the operating time <br /> of the shallower injection points for selected areas. <br /> ■ Review off site MTBE well response over time (in detail) for the intermediate and deeper <br /> intervals. <br /> ' 5:1268231QM reports12005 1 stQR.doc 12 <br />