Laserfiche WebLink
1• T M Ir M <br /> .lAMAR - SUMMARY O OP <br /> ERATIONAL DATA <br /> C-SPARGE TREATMENT SYSTEM DATA <br /> TOTAL SINCE <br /> GENERAL INFORMATION 2ND QUARTER 3RD QUARTER 2004 TOTAL <br /> OPERATIONS BEGAN <br /> S stem Operational Status <br /> Subtotal 2nd.'; Subtotal rd Cummulative Cummulative Since <br /> Parameter June Qtr 2{104 July August September =Qtr 20x4 2004 Operations Began <br /> Run Time(hrs) 270.98 27088 603.86 381.61 230.61 �� 1�26fl8 14$6.96 1486.96 <br /> Actual Operation Time{hrs) 240.77 ��� 240;;77 538.73 339.19 204.971'Q'$089 1321.66 1321.66 <br /> Scheduled Non-Operation(hrs) 30.11 3411 67.13 42.42 25.64 -1®359 165.3 165.3 <br /> Scheduled Maintenance(hrs) 0 0 0 0 0 0 0 D <br /> Downtime(hrs) 53.12 53:'12 140.14 362.39 489.39 m 99I92 1045.04 1045.04 <br /> Scheduled Non-Operation + 83.23 83':23 207.27 404.81 515.03 12� 1 121 D.34 1210.34 <br /> Maintenance+Down Time(hrs) <br /> Run Time{%) 83.60% 1 $360°!°- 81.16% 1 51.29% 32.03% X830'0 62.02% 62.02% <br /> Actual Operation Time(%) 74.31% 74 31.°!0 72.14% 45.59% 28.47% �{$73s 55.13% 55.13% <br /> Scheduled Non-Operation (%} 9.29% 9:29% 9.02% 5.70% 3.56% fT UMHO =- 6.89% 6.89% <br /> Scheduled Maintenance(%) 0.00% 0_00%..: 0.04% 0.00% 0.00% Ron.. 0 0.04% O.DO% <br /> Downtime(%) 16.40% 16 40% 1$.$4% 48.71% 67.97% ` 47° 37.98% 37.98% <br /> Scheduled Non-Operation+ 25.69% 25 ti9% 27.86% 54.41% 71.53% 51 2 %0 i 44.87% 44.87% <br /> Maintenance+Down Time(%) <br /> r <br /> Mass Ozone Injected(Ibs)by System and by Individual Well <br /> Unique Number Injection Interval Subtotal 2nd' September Cummulative Cummulative Since <br /> :...,., n:lv Auoust <br /> em MM mom <br /> rim <br /> '5504 <br /> TABLE 4 <br /> WELL COMPLETION DETAIL <br /> Jamar Service Station, 4075 East Main Street, Stockton, CA <br /> Page 2 of 2 <br /> "Note:depth of Wells and Screens MW2,MW5, MW6b,MW7b and EW1 appear to be off depth based on later well depth soundings <br /> 1 Based on sounded total depth on 8113104 and 9/13/04;See field notes. <br /> 2 Based on sounded total depth on 9/13104;See field notes. <br /> 3 Based on sounded total depth on 9/13104;See field notes. <br /> 4 Based on sounded total depth on 9113104; See field notes. <br /> 5 Based on sounded total depth on 9113/04;See field notes. <br /> INJ=Remediation Well <br /> GWM=Ground Water Monitoring <br /> I <br />