My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012510
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
3500 - Local Oversight Program
>
PR0545509
>
ARCHIVED REPORTS_XR0012510
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 5:14:40 PM
Creation date
3/10/2020 3:56:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012510
RECORD_ID
PR0545509
PE
3528
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
02
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CA <br /> A S S O C I A T E S I N C <br /> RECOMMENDATIONS <br /> Based on the results of the first quarter 2004 monitoring episode, we recommend the following: <br /> • Conduct the second quarter 2004 groundwater monitoring and sampling of wells MW1 <br /> through MW9c and EW I and analyze the samples for TPHg, TPHd, BTEX MTBE, <br /> ETBE, DIPS, TBA, TAME, 1,2-DCA, and EDB. <br /> • Additional subsurface investigations activities, including the installation of off-site <br /> groundwater monitoring wells, are ongoing and will be detailed in a separate report. <br /> • Interim remediation system installation activities are ongoing and will be detailed in a <br /> separate report. <br /> Please contact our office at (209) 579-2221 if you have any questions or comments. <br /> Respectfully submitted, <br /> ATC Associates Inc. <br /> • John Sellman <br /> Staff Geologist <br /> b)4,jv <br /> Drew Van Allen <br /> Senior Project Manager �` y'(rr" <br /> 4•� i itJ`h4���i t��^41 <br /> J �Homsey:PTR. "� Fkt� : r J d v1 {- <br /> CA Registered Civil Engineer No. 47410 .._!�� <br /> cc: Jay McIlrath, Stockton Petroleum <br /> James Barton, CVRWQCB ` :•�_� <br /> S:1268231QM reports12004 1QR.doe 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.