My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012760
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
3500 - Local Oversight Program
>
PR0545509
>
ARCHIVED REPORTS_XR0012760
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 5:43:30 PM
Creation date
3/10/2020 3:59:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012760
RECORD_ID
PR0545509
PE
3528
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
02
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 2 <br /> (MW-2 - CONCENTRATIONS IN SOIL PPM <br /> SAMPLE TPHG TPHD MTBE B T E X <br /> B2-5 NA NA NA NA NA NA NA <br /> B2-10 NA NA NA NA NA NA NA <br /> B2-15 NA NA NA NA NA NA NA <br /> B2-20 NA NA NA NA NA' NA NA <br /> B2-25 NA NA NA NA NA NA NA <br /> B2-30 ND ND ND ND ND ND ND <br /> B2-35 1 . 5 ND ND 0.21 0. 049 0. 009 0 . 13 <br /> B2-40 1 . 2 ND ND 0 .079 0 .034 ND 0 .017 <br /> B2-45 1 . 6 ND . 0075 0. 33 0 . 078 0 . 043 0 . 082. <br /> B2-50 4. 3 ND ND 0. 14 0. 20 0 . 053 0 .21 <br /> B2-55 ,< 7 ND 0 .012 0 .029 0. 81 0 . 17 0.75 <br /> B2-60 4.7 ND 0 . 025 �'0� 73' 0. 69 0 . 15 . 0. 75 <br /> B2-65 3 . 8 ND 0 . 053 0 . 63 0 .035 0.030 0 . 16 <br /> B2-70 1 . 5 ND 0.0056 0. 70 0. 023 ND 0 . 11 <br /> :. N 2.""'�. 0.033 ND 0.088 <br /> NA = NOT APPLICABLE <br /> ND = NOT DETECTED <br /> The soil samples taken from the MW-2 boring from 30 feet below <br /> grade to the termination of drilling contained TPHG, MTBE and <br /> BTEX at concentrations which were above Non-Detectable. <br /> The PID readings were essentially background for the first SIX <br /> samples collected in the soil borings for MW-2. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.