Laserfiche WebLink
c MMW-5 <br /> p <br /> PRISCILLNS atR <br /> CLEANING <br /> SERVICES ` <br /> erhead Electr c Line_ <br /> gI MW4fa _ <br /> ml <br /> 1 EASTMA/NSTREET <br /> nI , <br /> �I <br /> I <br /> - PHONES <br /> W-2 \ <br /> m10 <br /> W_ MW-13 B-5 <br /> ® . t�MW Overhead Electric Line <br /> \ \ VWA/ MW-12ta VW — <br /> \ \VW-5/ • VW-2/ B-2' \ <br /> Vw$ VW-3 • \`MW-14 s \ <br /> \ \ DISPENSER AS-1 B-6. MW$ \ <br /> \ \\\ ISLANDS SM�V3 \ <br /> .B-3 <br /> \ \\ \\\\_\\\\ i\ts\Msw-1-1�•\\\ <br /> \ �6jI S1=7 <br /> GA1S,\NuE1pJ�xe!�.B\- <br /> (DMW-17 <br /> Mw-11 �7 <br /> B-8s1 <br /> \ <br /> \\ <br /> \— <br /> \\) <br /> ®CPTt B-5, M <br /> MW-9 Wel CPT-3 <br /> _ '\ <br /> \ <br /> \ <br /> \ <br /> \ <br /> \/x MW-1$ <br /> (D <br /> \ ®CPT-2 DIRT \ <br /> \�MW-16 A�ROX\We <br /> P�OPE� <br /> LEGEND: <br /> t' <br /> la MW-9 GROUNDWATER MONITORING WELL <br /> VW-6 VAPOR EXTRACTION WELL <br /> •B B SOIL BORING <br /> 0 AS-1 AIRSPARGEWELL <br /> I)CPT1 CONE PENETROMETER TEST BORING r <br /> �MWA7' PROPOSED MONITORING WELL LOCATION J <br /> ®CPT-3 PROPOSED CONE PENETROMETER TEST BORING <br /> PROPOSED'''OI�LBORINaaLOCATION <br /> t 0 50 FT <br /> SOURCE:FIGURE MODIFIED FROM DRAWING PROVIDED BY ACTON,MICKELSON,VAN DAM,INC. <br /> AND SURVEY BY RON ARCHER CIVIL ENGINEER,INC. APPROXIMATE SCALE <br /> HORIZON ENVIRONMENTAL INC. %SITE PLAN w FIGURE <br /> Project Number:' 1474.13 Drawn By: M.Lacoste BEACON STATION NO. 12474 2 <br /> Prepared By: R.Smith Date: 5/16/03 3440 EAST MAIN STREET <br /> Reviewed By. G.Barker Revised Date: STOCKTON,CALIFORNIA <br />