My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
3440
>
3500 - Local Oversight Program
>
PR0545495
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 6:42:41 PM
Creation date
3/10/2020 4:08:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0545495
PE
3528
FACILITY_ID
FA0006423
FACILITY_NAME
STOCKTON MOBIL 2
STREET_NUMBER
3440
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
3440 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTH DEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> Unit Supervisors <br /> Donna K Heran,R.E.H.S. <br /> •: .. :< 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S. <br /> Director Mike Huggins,R.E.H.S.,R.D.I. <br /> 71. Al Olsen,R.E.H.S. Stockton, California 95202-2708 <br /> Douglas W.Wilson,R.E.H.S. <br /> Program Manager Tele hone: (209)468-3420 Margaret Lagorio,R.E.H.S. <br /> F o ar' Laurie A.Cotulla,R.E.H.S. p <br /> Program Manager Fax: (209) 464-01.38 Robert McClellon,R.E.H.S. <br /> Mark Bazcellos,R.E.H.S. <br /> JOE ALDRIDGE <br /> BILE COPY <br /> ULTRAMAR INC <br /> 685 WEST THIRD ST <br /> HANFORD CA 93230 <br /> RE: Former Beacon #12474 SITE CODE: 1173 <br /> 3440 E. Main St. RO#: 00066 <br /> Stockton, CA., 95205 <br /> WORK PLAN: "Work Plan for an Additional Subsurface Investigation <br /> and Interim Soil Remediation." <br /> DATED: July 25, 2002. <br /> PREPARED BY: Horizon Environmental Inc. — Rexford K. Smith, RG. <br /> STATUS: APPROVED <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S <br /> 25299.37, subd(C)(3)1: <br /> • Install one cone penetrometer testing (CPT) boring onsite to 130' for <br /> soil lithology only and, <br /> • Install four `hydropunch' borings to 130' bgs and collect grab- <br /> groundwater samples at 100' and 130' in two borings and only at <br /> 130' bgs in the other two borings and, . <br /> • Analyze groundwater samples for TPHg, BTEX, methanol, ethanol, <br /> MtBE, EtBE, DIPE, TAME, TBA, 1,2-DCA and EDB and, <br /> • Submit report of findings to EHD. <br /> COMMENTS AND CONDITIONS: <br /> • Submit EHD well installation permit application and fee. <br /> REASONS FOR DISAPPROVAL OF THE WORK PLAN [H&S 25299 37 <br /> subd(c)(3)1: <br /> • none <br /> DATED: August 23, 2002. BY:C-. -Z&9Z' �5Pp <br /> Michael Inf a, Senior REHS (209) 468-3454 <br /> [X] Faxed to consultant on: a?i. <br />
The URL can be used to link to this page
Your browser does not support the video tag.