My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005239
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
3440
>
3500 - Local Oversight Program
>
PR0545495
>
ARCHIVED REPORTS_XR0005239
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 7:53:11 AM
Creation date
3/10/2020 4:20:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005239
RECORD_ID
PR0545495
PE
3528
FACILITY_ID
FA0006423
FACILITY_NAME
STOCKTON MOBIL 2
STREET_NUMBER
3440
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
3440 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Former Beacon Station No,104 February 26,2003 <br /> Stockton California Preliminary Results Report and Work Plan Addendum <br /> . Stockpile drill cuttings at the site on and covered with visqueen. Collect four <br /> representative samples of the drill cuttings stockpile for characterization and <br /> disposal purposes. <br /> Monitoring well borings shall be 8 inches in diameter. Monitoring wells shall <br /> consist of 2-inch inside diameter (ID), flush-threaded, Schedule 40, polyvinyl <br /> chloride (PVC) casing and 2-inch ID, PVC, 0.020-inch slotted well screen. <br /> Install 43 sand filter pack adjacent to and extending approximately 2 feet <br /> above the screened intervals. The filter packs shall be sealed with <br /> approximately 5 feet of fine sand. Neat cement sanitary seals shall be set in <br /> the remaining annulus after installation of the filter packs and filter seals. The <br /> flush-mounted well heads shall be fitted with locking caps and the surface <br /> shall be completed with flush-mounted traffic-rated vault boxes. A typical <br /> monitoring well construction diagram is contained Appendix E. <br /> Submit selected soil samples from the new monitoring well borings and <br /> submit. under COC documentation, to Kiff for analysis of. TPHg, BTEX, the <br /> seven fuel oxygenates, DCA and DBA by EPA Method 826013. Additionally <br /> analyze the stockpile soil sample for total lead by EPA Method 6010. <br /> Task 3 Develop and sample the new monitoring wells according to Horizon Field <br /> Methods and Procedures. Survey the top-of-casing elevation of the new <br /> monitoring wells to GeoTracker specifications. <br /> I <br /> Submit groundwater samples, under COC documentation, to Kiff for analysis <br /> of. TPHg, BTEX, the seven fuel oxygenates, DCA and DBA by EPA Method <br /> 826013. <br /> Task 4 Prepare a report which documents installation of the additional monitoring <br /> wells and analytical results of soil and groundwater sampling. Evaluate the <br /> C:\Projects\1474\14\WPaddnm2-03.doc <br /> Project No. 1474.14 6 HORIZON ENVIRONMENTAL INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.