Laserfiche WebLink
Former Bt.acon Station No 12474 January 17, 2005 <br /> Stockton, California _ Quarterly Groundwater Monitoring Report <br /> Health Services-certified analytical laboratory (FLAP No 2236) located in Davis, <br /> California The samples were analyzed for total petroleum hydrocarbons as gasoline <br /> (TPHg), the volatile aromatic compounds benzene, toluene, ethylbenzene and total xylenes <br /> (BTEX), and the fuel oxygenate methyl-t-butyl ether (MTBE) by Environmental Protection <br /> Agency (EPA)-Method 8260B -Wells-MW-13 through_MW_-17 were_also_analyzed for 1,2- <br /> dichloroethane (DCA) by Environmental Protection Agency (EPA) Method 8260B <br /> Groundwater Monitoring Results i <br /> Depth-to-groundwater measurements were subtracted from the surveyed TQC elevations to <br /> calculate groundwater elevations Groundwater elevation data, as summarized in Table 1, <br /> were_used=to-construct=the=groundwater=elevation=contour=map-shown_on=Figure=2 The <br /> groundwater flow direction in the dispenser island area varied from eastward to <br /> southeastward under an approximate gradient of 0 001 <br /> Groundwater analytical results are summarized in Table 1 Benzene concentration data were <br /> used to construct an isoconcentration map as shown on Figure 3 Analytical reports are <br /> contained in Attachment C Historical groundwater level and analytical data collected prior <br /> to 1998 are summarized in Tables 1 and 2 in Attachment D <br /> GeoTracker Electronic Data Deh-werables <br /> The analytical electronic data deliverable (EDD) is uploaded by Kiff The groundwater well <br /> measurement file EDD (GEO_WELL) for this quarterly monitoring event was uploaded by <br /> Horizon The GEO_WELL upload confirmation sheet for this quarter is contained in <br /> Attachment F <br /> Recommendations <br /> In February 2004, Horizon drilled and installed additional groundwater monitoring wells j <br /> (MW-13 though MW-17) for the purpose of evaluating the extent of impacted groundwater <br /> conditions The draft report of the investigation is in preparation <br /> Installation of a vapor extraction system (VES) and an air sparging system was completed in <br /> August 2004 The San Joaquin Valley Air Pollution Control District issued a modified <br /> Authority to Construct permit in October Final equipment connections were made in <br /> December 2004 Start up of the VEW is expected in January_2005 <br /> 474gmr 0404 clot <br /> Project No 1474 47 2 HORIZON ENVIRONMENTAL INC. <br />