Laserfiche WebLink
Mq�N 1/b��ti <br /> �T <br /> SB-z+ <br /> Pump <br /> Islands SB-2+ <br /> Limit <br /> T12 T13 Of <br /> P ==0_ Excavation <br /> I r--------1 I <br /> I I O --------�-1 T 14—C <br /> I L------...1 1 <br /> Ir--_----- I <br /> I I O 1 1 <br /> T11 T10 Q <br /> Sales S133—^3 <br /> Area <br /> \ O � <br /> M IV <br /> Ul <br /> 4" Lateral Sewer Line <br /> 0 30 60 <br /> LEGEND <br /> Approximate Scale <br /> + Soil Boring Location (in feet) <br /> I-----.-I Underground Tank And . FIGURE 8 <br /> L--� 1Tank Number <br /> T'3 IN TANK BASSOIL SAMPLE MAP (9/23/93) <br /> 3 Soil Sample BEACON STATION #474 <br /> I 3440 EAST MAIN STREET <br /> STOCKTON, CALIFORNIA <br /> Project No. Drawn Beton • <br /> Mickelson • van Dam. Inc. <br /> 19012.01 DA 10/11/93 <br /> File No. Prepared Consulting Scientists, Engineers, and Geologists <br /> Base Mop derived from <br /> Groundwater Technology, Inc. FIGs TAD 5090 Robert J. Mathews Parkway, #4 <br /> Report of Investigation Revision Reviewed El Dorado Hills, California 95762 <br /> (916) 939-7550 <br />