Laserfiche WebLink
. Quarterly Status Report-Second Quarter 1998 <br /> Former Beacon Station No. 474 <br /> Stockton? California <br /> SUMMARY OF THIS QUARTER'S ACTIVITIES: <br /> Groundwater sampling of all the wells was conducted by Doulos Environmental on June 10, <br /> 1998. A Work Plan For Remedial Investigation was prepared to propose the installation of an <br /> air-sparge well and performance of air-sparge and soil-vapor extraction testing. <br /> RESULT OF QUARTERLY MONITORING: <br /> Analytical results for this quarter indicate that dissolved concentrations of hydrocarbons were <br /> greatest in MW-b. Minor hydrocarbon concentrations were detected in Monitoring wells <br /> MW-8 and MW-9. <br /> PROPOSED ACTIVITY OR WORK FOR NEXT QUARTER: <br /> ACTIVITY ESTIMATED COMPLETION DATE <br /> Perform quarterly groundwater monitoring September 1998 <br /> Anticipate receiving authorization to proceed <br /> with remedial testing <br /> i <br /> • <br />