08-02-91 PHS/EHD receives a WP for the installation of an additional well to the southwest of the <br /> former dispenser island, in the verified downgradient direction. <br /> 09-27-91 PHS/EHD receives a request from the consultant for an extension of the due date for the <br /> submittal of the PAR to 10-30-91. <br /> 11-18-91 PHS/EHD receives a letter and a report on the subsurface investigation from the RP. The <br /> RP again asks for closure. The report shows all six soil samples taken from the boring of <br /> MW#4 as nondetect for TPH as gasoline and BTEX at detection limits of 1.0 ppm, and 0.003 <br /> ppm, respectively. The groundwater samples collected in September show TPH as gasoline <br /> and BTEX as nondetect at detection limits of 50 ppb, and 0.5 ppb, respectively. <br /> Groundwater at the site is at approximately 29' BGS and the flow direction is still to the <br /> southwest <br /> 03-24-92 PHS/EHD receives a WP for four soil borings and for the sampling of MW#4. <br /> 04-27-92 PHS/EHD receives letter from RP again asking for closure. <br /> 05-19-92 PHS/EHD visits site to observe the drilling and grouting of four soil borings. One SB was <br /> located to the southwest of the former tank pit area, one SB was installed on the <br /> southwestern end and the northeastern end of the dispenser island and the fourth SB was <br /> installed to the northwest of the former dispenser island, in the grass area. These borings <br /> were drilled using a probe type tool with a clear PVC liner inside. The probe was pushed <br /> down through the soil and a three foot continuous core is retrieved. A portion of this core is <br /> cut with a knife, sealed, and stored in the ice chest for transport to the lab. <br /> 05-27-92 PHS/EHD sends letter to RP explaining the closure evaluation process. The letter also <br /> states that some of the reports are missing and need to be resubmitted. <br /> 12-02-92 PHS/EHD sends letter to RP requesting a report of the field work (confirmation SBs) <br /> conducted on 05-19-92 to be submitted by 12-31-92. The letter also requests a QR by 01- <br /> 15-93. <br /> 12-17-92 Meeting held at PHS/EHD with RP and consultant attending. Issues discussed were the <br /> fact that the seasonal high groundwater is 15'BGS. Current groundwater is at 30' BGS. The <br /> contamination is probably "hung up" in the soil but may impact groundwater again at a later <br /> date if the groundwater rises to previous levels. The soil borings completed recently for <br /> confirmation were between 5' and 15' BGS. The soil between 15' and 30'BGS still needs to <br /> be investigated. The report of the field work conducted in May 1992 not yet submitted. <br /> 12-00-92 <br /> through <br /> 02-22-96 Groundwater sampling and monitoring conducted during this time period with intermittent <br /> detections of low levels of BTEX. However, highest benzene concentration during this time <br /> was 1.3 ppb. <br /> 11-28-95 PHS/EHD receives soil boring results of soil borings installed in 1992. <br /> 01-17-96 PHS/EHD receives closure report. PHSIEHD concurs with request for closure pending the <br /> results of recent groundwater analysis of MTBE. <br /> 03-19-96 PHS/EHD receives quarterly report showing all wells nondetect for MTBE. Low levels of <br /> toluene persist. PHS/EHD process site for closure. <br /> 3 <br />